You have arrived at Oil & Water Don't Mix website - the campaign working to
protect Michigan from an oil spill in the Great Lakes from an outdated pipeline.

TAKE ACTION

Tell the DEQ they need to follow the law. Sign this petition now.

OWDMTake Action Now

The entire engineering of how the Line 5 pipeline is anchored to the Great Lakes bottomlands has changed - WITH NO STATE REVIEW or approval.

Enbridge is asking the Michigan Department of Environmental Quality (DEQ) to approve the company’s application to add 22 new screw anchors to prop up Line 5. Enbridge is trying to get around a full legally-required review of the rest of the underwater portion of the pipeline and is ignoring the effect that these anchor supports will have on the integrity of the pipeline moving forward.

The original pipeline design did not specify the use of screw anchors. In fact, this type of anchor is responsible for a majority of the coating damage that Enbridge has known about since at least 2014, but the public just found out about in October 2017.

Anchors are not a repair - they're new infrastructure

According to state law, new materials used to support the pipeline should trigger a full integrity review of the entire underwater segment of Line 5. The DEQ has failed to follow the law, and in doing so, they have failed to hold Enbridge responsible - even with the Great Lakes ecosystem and 720 miles of shoreline at risk.

Sign the Petition

Director Grether, Division and Unit Chief Fish, and the Gaylord Office Unit Supervisor Haas, and Great Lakes Submerged Land Specialist Graft:

We urge you to deny Enbridge’s pending Line 5 anchor permit application to install 22 new screw anchors onto the bottomlands of Lake Michigan, and instead, require Enbridge to file a new conveyance application for the entire underwater Line 5 pipelines to occupy our public trust waters and bottomlands of the Great Lakes. This is what the law requires.

Enbridge’s Screw Anchors Constitute a New Design, Not a Repair. Since 2002, Enbridge has installed 128 permanent screw anchors along Line 5 fastened into the lakebed, contending that this new design is mere repair and maintenance. This new engineering design, however, has transformed the entire underwater pipeline infrastructure by elevating it off the lakebed floor.

The original 1953 engineering design placed Line 5 pipelines in a trench on the bottomlands with no maximum support longer than 75 feet to prevent metal fatigue and rupture. This engineering design was a key provision of the 1953 legal Easement between Enbridge and the State of Michigan. But Enbridge routinely violated the 75-foot maximum span requirement and did not properly design its dual pipelines to withstand the swift currents in the Straits of Mackinac.

For nearly the first 50 years of Line 5 occupying the public trust waters of Lake Michigan, Enbridge used sandbags to provide support. Enbridge’s “solution” – to elevate the pipeline off the lakebed floor with screw anchors – is not a mere repair, but rather a completely new design that was never authorized and has never been evaluated under the 1955 public trust law of the Great Lakes Submerged Lands Act (“GLSLA”).

New Evidence Reveals that Enbridge Knew Screw Anchors Were Damaging Line 5 Pipeline Coating Since 2014. In October 2017 – four months after Enbridge submitted the original DEQ permit — the public learned that Enbridge had acted in bad faith and had known about damage to Line 5’s protective coating in the Straits of Mackinac as early as 2014 but did not disclose this critical information to state or federal officials until late in the summer of 2017. This material information could have altered previous state and federal authorizations in 2016 and 2017 that allowed additional screw anchors to be installed into the lakebed.

Material Change Triggers Full Review of Entire Underwater Pipeline Infrastructure. Given Line 5’s new design with permanent structures and material changes, the DEQ must direct Enbridge to go back to the drawing board and submit a new conveyance application under the law. Nothing less than this will protect the Great Lakes from a catastrophic oil spill.

2,235 SIGNATURES
Help Reach the Next Goal: 2,500 signatures

Will you sign?


Showing 2186 reactions

  • Christine Ballard
    posted about this on Facebook 2018-02-16 19:54:32 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Aaron Jenkins
    signed 2018-02-16 19:51:22 -0500
  • Ruth Wilson
    signed 2018-02-16 19:48:47 -0500
  • Linda Turner
    signed via 2018-02-16 19:47:19 -0500
  • Catherine Parker
    signed 2018-02-16 19:42:59 -0500
    Catherine Parker
  • Diane Martin-Brodak
    signed 2018-02-16 19:36:24 -0500
    Diane Brodak
  • Robin Hendricks
    signed 2018-02-16 19:20:18 -0500
    Line 5 is an expired pipeline and needs to be removed from the Mackinac Straits. The Public Trust Doctrine should prevent this private corporation from profiting off the transport of oil thru this protected waterway. The Great Lakes have been at risk long enough. Shut down Line 5!
  • Nancy Klein
    signed 2018-02-16 19:17:05 -0500
    nancy klein
  • Lynn McGovern
    posted about this on Facebook 2018-02-16 19:14:06 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Lynn McGovern
    signed 2018-02-16 19:13:52 -0500
  • Sarah O'Brien
    signed 2018-02-16 19:08:19 -0500
  • Denise McDowell
    signed 2018-02-16 19:06:15 -0500
  • Ilze Hammersley
    signed 2018-02-16 18:57:14 -0500
  • Matthew Manker
    signed 2018-02-16 18:15:08 -0500
    Matthew Manker
  • Suz McLaughlin
    posted about this on Facebook 2018-02-16 18:05:11 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Suz McLaughlin
    signed 2018-02-16 18:04:54 -0500
    STOP putting LIPSTICK on a SOW’s EAR! SHUT IT DOWN!!!
  • Douglas Lovitt
    posted about this on Facebook 2018-02-16 17:29:48 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Douglas Lovitt
    signed via 2018-02-16 17:29:17 -0500
    douglas t lovitt
  • Christina Riddle
    posted about this on Facebook 2018-02-16 16:48:50 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Christina Riddle
    signed 2018-02-16 16:48:38 -0500
    We don’t have much time left. My 8 grand kids depend on our fresh water in their future!
  • Karen Jallos
    signed 2018-02-16 16:46:51 -0500
    The Great Lakes are a natural wonder!! Save them! Protect them! Get that pipeline shut down before bigger leaks and a total disaster occur!! For the good of all ! For health, safety, and justice.
  • Julye Raycraft
    posted about this on Facebook 2018-02-16 16:20:37 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Julye Raycraft
    signed 2018-02-16 16:20:16 -0500
    One spill is too many.
  • Chris Lahti
    signed 2018-02-16 16:13:50 -0500
  • Mitch Piner
    signed 2018-02-16 16:04:53 -0500
    mitch piner
  • Joan Shores
    signed 2018-02-16 16:03:35 -0500
    joan shores