TAKE ACTION

When you sign, we'll submit this as your official comment by the December 17 deadline calling on the U.S. Army Corps of Engineers (USACE) to deny the Enbridge tunnel permit.

5 Million Gallons a Day

Enbridge wants the federal government to rubber-stamp a Clean Water Act permit that would allow the Canadian company to dump up to 5 million gallons of wastewater a day into the Great Lakes during tunnel construction. They believe we should ignore the danger of oil pipelines and a dangerously flawed plan to build an underground tunnel in the Straits of Mackinac.

SIGN THE PETITION

Burying the problem of oil pipelines in a tunnel in the Great Lakes doesn’t make it go away. What's more, every day the oil does make its way to refineries and burned as gasoline and propane it spills carbon into the atmosphere, making everything worse.

PETITION

I request that the U.S. Army Corps of Engineers conduct an Environmental Impact Statement (EIS) under the National Environmental Policy Act (NEPA) in connection with Enbridge Energy’s application for a Department of the Army permit for a massive fossil fuel tunnel in the Straits of Mackinac.

The project submitted by Enbridge is intentionally designed to avoid full review under the law and thorough analysis. Enbridge characterizes its project as replacing an old dual pipeline system in the Straits of Mackinac to continue transporting crude oil and petroleum liquids between the peninsulas of Michigan. In fact, the project would irreversibly commit the natural and other resources of the United States, Michigan, and the Great Lakes for another 99 years and presents unacceptable risks to those resources.

A project of this magnitude, with its potential for causing significant harm to public trust resources, must be very carefully and thoroughly considered. The Army Corps must prepare an EIS under NEPA because Enbridge’s proposed tunnel activity constitutes a “Major Federal Action Significantly Affecting the Quality of the Human Environment.” The need for a full EIS that analyzes the project as submitted by Enbridge and the entire 645-mile Line 5 pipeline is required, as detailed in the July 14, 2020 comments submitted to the Army Corps by 10 organizations representing tribal, environmental, and other citizens groups.

In addition, since those comments were submitted, additional information has also revealed the need for an EIS under NEPA:

  1. Significant flaws in Enbridge's tunnel proposal, including mischaracterization of the geological formations that will be encountered, a lack of geotechnical research, the tunnel design and alignment, and the potential for devastating outcomes due to poor planning and cutting corners in research and design.
  2. A potentially significant archeological finding at the proposed tunnel project site subject to the National Historic Preservation Act.
1,294 SIGNATURES
Help Reach the Next Goal: 1,250 signatures

Will you sign?

or Text TUNNEL to +12314804112 to sign

Showing 1159 reactions

  • Lynne Coles
    signed 2020-12-16 23:21:48 -0500
  • Jeanne Davied
    signed via 2020-12-16 23:04:37 -0500
  • Alicia Trillo
    signed via 2020-12-16 22:54:59 -0500
  • Martha M. Wilson
    signed 2020-12-16 22:52:00 -0500
  • Citlalli Trujillo
    signed via 2020-12-16 22:48:17 -0500
  • Diana Marx
    signed 2020-12-16 22:39:46 -0500
    They track record of spills and lying about status of these lines when there is proof of their lies.
  • Stephen Luongo
    signed 2020-12-16 22:39:06 -0500
  • Elsie Peterson
    signed 2020-12-16 22:38:10 -0500
  • Maureen Naylid
    signed 2020-12-16 22:36:45 -0500
  • Barry Zavah
    signed via 2020-12-16 22:36:21 -0500
    I am well-familiar with the harm these pipelines bring — oh, so good the ad campaigns, denying the reality that is the experience with the Gulf Coast blow-out by BP and Energy Transfer Partners abominations against the Sioux Nation with their Dakota Access Pipe Line.
  • Kelley Keisch
    signed via 2020-12-16 22:35:09 -0500
  • Brian Vanderwal
    signed 2020-12-16 22:27:28 -0500
  • james kinney
    signed via 2020-12-16 22:27:19 -0500
  • Natalie Nespoli Moreira
    signed via 2020-12-16 22:25:10 -0500
  • Melisa Mallwitz
    signed 2020-12-16 22:20:35 -0500
  • Nicholas Kavalec
    signed 2020-12-16 22:19:19 -0500
  • William Braun
    signed 2020-12-16 22:17:57 -0500
  • Gerald Svetcos
    signed 2020-12-16 22:13:12 -0500
  • Johanna Rohde
    signed 2020-12-16 22:09:16 -0500
  • Molly Dutmers
    signed 2020-12-16 21:58:24 -0500
  • Samantha Damrn
    signed 2020-12-16 21:58:12 -0500
  • Todd Wolter
    signed 2020-12-16 21:47:31 -0500
  • Patricia Skifstad
    signed 2020-12-16 21:43:45 -0500
  • Emily Grandy
    signed 2020-12-16 21:42:14 -0500
  • Karen Deck
    signed 2020-12-16 21:39:56 -0500
  • Michael Clayton
    signed 2020-12-16 21:26:19 -0500
  • Debra Topping
    signed 2020-12-16 21:16:05 -0500
    Honor Treaties
  • Kathleen Tucker
    signed 2020-12-16 21:08:19 -0500
  • Nancy Cadieux
    signed 2020-12-16 21:03:05 -0500
    Shut down line 5! No tunnel! Please preserve our states greatest asset.
  • Rebecca Mackey
    signed 2020-12-16 20:56:29 -0500

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates