This is the report Enbridge tried to keep hidden from regulators on the proposed tunnel project. Despite the redactions, the report should concern everyone who cares about the Great Lakes – from “weak to very weak” rock quality, pressures exceeding 250 pounds per square inch, and an uncontrolled source of explosive methane gas, among other things.
Read our Substact, The Current, for a dive into what this means and why state regulators must deny the Line 5 oil tunnel permit.

Be the first to comment
Sign in with