TAKE ACTION

Tell the DEQ they need to follow the law. Sign this petition now.

OWDMTake Action Now

The entire engineering of how the Line 5 pipeline is anchored to the Great Lakes bottomlands has changed - WITH NO STATE REVIEW or approval.

Enbridge is asking the Michigan Department of Environmental Quality (DEQ) to approve the company’s application to add 22 new screw anchors to prop up Line 5. Enbridge is trying to get around a full legally-required review of the rest of the underwater portion of the pipeline and is ignoring the effect that these anchor supports will have on the integrity of the pipeline moving forward.

The original pipeline design did not specify the use of screw anchors. In fact, this type of anchor is responsible for a majority of the coating damage that Enbridge has known about since at least 2014, but the public just found out about in October 2017.

Anchors are not a repair - they're new infrastructure

According to state law, new materials used to support the pipeline should trigger a full integrity review of the entire underwater segment of Line 5. The DEQ has failed to follow the law, and in doing so, they have failed to hold Enbridge responsible - even with the Great Lakes ecosystem and 720 miles of shoreline at risk.

Sign the Petition

Director Grether, Division and Unit Chief Fish, and the Gaylord Office Unit Supervisor Haas, and Great Lakes Submerged Land Specialist Graft:

We urge you to deny Enbridge’s pending Line 5 anchor permit application to install 22 new screw anchors onto the bottomlands of Lake Michigan, and instead, require Enbridge to file a new conveyance application for the entire underwater Line 5 pipelines to occupy our public trust waters and bottomlands of the Great Lakes. This is what the law requires.

Enbridge’s Screw Anchors Constitute a New Design, Not a Repair. Since 2002, Enbridge has installed 128 permanent screw anchors along Line 5 fastened into the lakebed, contending that this new design is mere repair and maintenance. This new engineering design, however, has transformed the entire underwater pipeline infrastructure by elevating it off the lakebed floor.

The original 1953 engineering design placed Line 5 pipelines in a trench on the bottomlands with no maximum support longer than 75 feet to prevent metal fatigue and rupture. This engineering design was a key provision of the 1953 legal Easement between Enbridge and the State of Michigan. But Enbridge routinely violated the 75-foot maximum span requirement and did not properly design its dual pipelines to withstand the swift currents in the Straits of Mackinac.

For nearly the first 50 years of Line 5 occupying the public trust waters of Lake Michigan, Enbridge used sandbags to provide support. Enbridge’s “solution” – to elevate the pipeline off the lakebed floor with screw anchors – is not a mere repair, but rather a completely new design that was never authorized and has never been evaluated under the 1955 public trust law of the Great Lakes Submerged Lands Act (“GLSLA”).

New Evidence Reveals that Enbridge Knew Screw Anchors Were Damaging Line 5 Pipeline Coating Since 2014. In October 2017 – four months after Enbridge submitted the original DEQ permit — the public learned that Enbridge had acted in bad faith and had known about damage to Line 5’s protective coating in the Straits of Mackinac as early as 2014 but did not disclose this critical information to state or federal officials until late in the summer of 2017. This material information could have altered previous state and federal authorizations in 2016 and 2017 that allowed additional screw anchors to be installed into the lakebed.

Material Change Triggers Full Review of Entire Underwater Pipeline Infrastructure. Given Line 5’s new design with permanent structures and material changes, the DEQ must direct Enbridge to go back to the drawing board and submit a new conveyance application under the law. Nothing less than this will protect the Great Lakes from a catastrophic oil spill.

2,234 SIGNATURES
Help Reach the Next Goal: 2,500 signatures

Will you sign?


Showing 2185 reactions

  • Paul McKinley
    signed 2018-02-18 06:58:45 -0500
    Eliminate the pipeline! Enbridge cannot be trusted. Any oil in our lakes is intolerable
  • Gary Reed
    signed 2018-02-18 06:58:15 -0500
  • Gretta Van Bree
    signed 2018-02-18 06:58:04 -0500
  • Mary Finnegan
    signed 2018-02-18 06:56:27 -0500
  • Vincent Lasak
    signed 2018-02-18 06:56:01 -0500
  • Barbara Glassheim
    signed 2018-02-18 06:55:38 -0500
  • James Rauner
    signed 2018-02-18 06:54:57 -0500
  • Beverly Fogarty
    posted about this on Facebook 2018-02-18 06:54:52 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Beverly Fogarty
    signed 2018-02-18 06:54:26 -0500
  • Robert Lachapelle
    signed 2018-02-18 06:53:56 -0500
  • Cheryl Jordan
    signed 2018-02-18 06:53:49 -0500
  • Jacky Smith
    signed 2018-02-18 06:53:43 -0500
    DEQ, this is an issue that could affect the whole world and we’re watching.
  • Lee D Winslow
    signed 2018-02-18 06:52:48 -0500
    I want a full review of Line 5. The Great Lakes are too important to Michigan for anything less than a review.
  • Ilene Beninson
    signed 2018-02-18 06:52:37 -0500
    Ilene Beninson
  • Renu O'Connell
    signed 2018-02-18 06:52:08 -0500
  • George Cole
    signed 2018-02-18 06:51:41 -0500
  • Mary Schmidt
    signed 2018-02-18 06:50:55 -0500
    I want to wear flip flops in my house—not shoe covers to protect my floors from oil. Please do not allow Enbridge to continue to cobble together temporary fixes for a faulty pipeline that threatens the life and waters I hold dear.
  • Nancy Smith
    signed 2018-02-18 06:50:07 -0500
  • Carol Kd
    posted about this on Facebook 2018-02-18 06:49:24 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Carl Fangboner
    signed 2018-02-18 06:49:01 -0500
  • Annette Hagerty
    signed 2018-02-18 06:48:58 -0500
  • Carol Dodds
    signed 2018-02-18 06:48:50 -0500
  • Martha Phillips
    signed 2018-02-18 06:48:43 -0500
    Keeping this aged out pipeline endangers our precious lake and all Michigan residents. Public health and safety are at risk.
  • Melissa VerDuin
    posted about this on Facebook 2018-02-18 06:48:28 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Melissa VerDuin
    @VerduinMelissa tweeted link to this page. 2018-02-18 06:48:26 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors. http://www.oilandwaterdontmix.org/review_the_line_5_pipeline?recruiter_id=34884
  • Dianne Karsh
    signed 2018-02-18 06:48:25 -0500
  • Melissa VerDuin
    signed 2018-02-18 06:48:07 -0500
    We don’t NEED anchors! WE NEED IT SHUT DOWN! OUR KIDS DESERVE CLEAN DRINKING WATER! WE NEED WATER TO SURVIVE,THIS IS VERY IMPORTANT TO THE WORLD! BUT THE PEOPLE THAT LIVE HERE ARE VERY CONCERNED! WE ARE WATCHING! NO MORE PROFITS BEFORE PEOPLE AND PLANET! SHUT IT DOWN! THIS IS RIDICULOUS AND RISKY! WATER IS LIFE!
  • Michael Salgat
    signed 2018-02-18 06:47:11 -0500
  • patrick Egan
    signed 2018-02-18 06:46:40 -0500
  • Rae Jones
    signed 2018-02-18 06:46:31 -0500
    Do the full review. The Great Lakes are vital and need to be protected.

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates