Take Action

Add your name to these public comments to be submitted to Michigan state agencies by signing this petition.

PLEASE NOTE! The State of Michigan has closed the comment period. You may still sign the petition here, but the State of Michigan will not recieve your comment.

OWDMTake Action Now

Last June, the preliminary Line 5 Alternatives Study was released, and more than 23,000 people submitted their comment calling for the shutdown of Line 5 as the only alternative that will truly protect the Great Lakes from an oil spill. The revised and final Alternatives Study has just been released, which has triggered a second comment period that is now open.

Prevent a Catastrophic Great Lakes Oil Spill

The deadline for public comments is December 22, 2017, so please sign on and submit your comment today via this online form. Let's prevent a devastating oil spill in the Straits of Mackinac.

To the Michigan Department of Environmental Quality, Michigan Agency for Energy, Michigan Department of Natural Resources, Michigan Governor, Michigan Attorney General, and Michigan Pipeline Safety Advisory Board:

I am writing to submit my official comment in response to the State of Michigan’s Line 5 final alternatives analysis dated October 26 and released on November 20. I am deeply disappointed in this final analysis. A draft alternatives report released in June was riddled with errors and omissions, and the final report contains most of the same failures.

This report fails to meet its overall purpose of “providing the State of Michigan and other interested parties with an independent, comprehensive analysis of alternatives to the existing Straits Pipelines, and the extent to which each alternative promotes the public health, safety, and welfare and protects the public trust resources of the Great Lakes.”

It lacks credibility because its author is Dynamic Risk, a firm with ties to Enbridge, the Canadian energy transport company that owns Line 5. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An independent expert review in December 2015 documented the practicality of this alternative.

Decommissioning Line 5 in the Straits of Mackinac is the only alternative that will prevent an oil spill with catastrophic consequences for the Great Lakes and the State of Michigan. Moreover, this final alternative report affirms that decommissioning is a feasible option with zero risks to the Great Lakes and minimal economic impacts to Michigan customers (e.g., two cents more at the gas pump and roughly 10 to 25 cents more for propane in the Upper Peninsula). 
 
It is time for the state to reject the flawed study, exercise its affirmative legal duty as public trustee of the Great Lakes and bottomlands, and shut down Line 5. The state should use that authority to revoke the 1953 easement agreement that Enbridge has consistently violated.

The risk of a spill is too great to allow Line 5 to continue to operate in the Great Lakes. Our state government should not put the Great Lakes, our economy, health, drinking water, fisheries, and way of life at risk from a catastrophic oil spill any longer. In fact, on November 16, the Coast Guard Coast commandant testified again to Congress that his agency is not prepared to clean up a large-scale pipeline oil spill in the Great Lakes.

I urge you to act as public trustees of our waters and bottomlands, enforce the easement in light of Enbridge’s ongoing violations, and begin the process of decommissioning Line 5 in the Straits of Mackinac to protect the Great Lakes from a catastrophic oil spill. The State of Michigan has a legal duty to take this enforcement action. Enbridge’s ongoing violations cannot be remedied. It is time for the state to act decisively and with urgency.

Specifically, the report on alternatives to Line 5 in the Mackinac Straits:

  1. Fails to follow the recommendations and standards outlined in the Michigan Petroleum Pipeline Task Force Report, which resulted from a process created by the governor and co-chaired by the attorney general, and therefore cannot be used by the State of Michigan “in making decisions about the future of the Straits Pipelines.”
  2. Neglects to provide the state with an independent, fair analysis of the alternatives to Line 5 as required by the Task Force Report. This final report remains biased toward allowing Line 5 to continue to operate and/or allowing Enbridge to build new oil infrastructure in the Straits of Mackinac and further expand its operations. That bias grows out of past, and potentially future, business relationships between Enbridge and the report’s authors.
  3. Fails to analyze existing pipeline infrastructure as an alternative to Line 5 in the Straits, which the state required Dynamic Risk to analyze, and leaving it out conflicts with Task Force recommendation 3 (b). It is unacceptable that the contractor eliminated this alternative without any analysis. The 1953 easement granted with strict conditions by the state to Enbridge does not guarantee transport of 540,000 barrels per day (bpd) of oil and natural gas liquids. In fact, the 1953 MPSC Order states 300,000 bpd, which means Enbridge is currently operating Line 5 at 80 percent over design capacity. 
  4. Fails to analyze new evidence disclosed by Enbridge affecting the pipeline’s integrity, including external corrosion, 48 bare metal spots caused by the installation of screw anchors, compromised cathodic protection, and historic excessive pipeline spans greater than the 75-feet limit (including a 286-foot span that was unsupported for years), as required by the legal operating agreement with the State of Michigan. Dynamic Risk’s rationale, in part, is that "it would be inappropriate to speculate on any of the above aspects of the coating condition."
  5. Fails to consider tribal sovereign treaty rights and feedback on the basis that Dynamic Risk was not a party to tribal and state consultations, which is an unacceptable dismissal of input by a key stakeholder. 
  6. Grossly underestimates the total economic spill costs at between $147 million and $310 million, when Enbridge’s cleanup costs of its 2010 Line 6B pipeline oil spill along a 40-mile stretch of the Kalamazoo River cost more than $1.2 billion.
  7. Overestimates an impact to propane supply, greatly exceeding what independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary, while another study found it would take only one railcar or 3 - 4 truckloads per day to replace the Line 5 propane supply to the U.P.
  8. Continues to show an unfair bias towards building a tunneled pipeline in the Mackinac Straits. The report estimates a much lower cost for a tunnel than other estimates for this type of infrastructure; it fails to consider the risk of a spill to the Great Lakes, rivers and streams from other portions of the 64-year-old pipeline if the Straits portion were rebuilt. Dynamic Risk prefers new pipelines, which was evident when the firm aggressively promoted building a tunnel in its proposal to do this report, and its analysis is deeply flawed.

 

5,364 COMMENTS
Help Reach the Next Goal: 6,000 comments

Will you submit your comment?

or Text PROTECT! to +12314804112 to sign or Text PROTECT to +12314804112 to sign

Showing 3503 reactions

  • Marcus Good
    signed 2017-12-22 09:49:43 -0500
    Do what’s right, save the water! We are made mostly of water
  • Luis Contreras
    signed 2017-12-22 09:49:38 -0500
    As a Sierra Club member, I respectfully request you consider this information: Timm also discovered a 2016 technical report that he calls a “smoking gun.” The operating-easement agreement for Line 5 between Enbridge and the state of Michigan mandates that there be no unsupported spans longer than 75 feet. According to engineer Mario Salvadori, who reviewed the design, “The pipe must not be allowed to span a valley of more than 140 feet.” But the 2016 report, conducted by the Ohio-based engineering firm Kiefner and Associates, mentions unsupported spans of up to 286 feet, indicating that over time the pipeline has shifted from its moorings. Timm shows me a graph of how the pipeline’s resiliency diminishes across increasing lengths of unsupported spans. Just like a bent paper clip, he says, a pipeline with inadequate support will become fatigued as it flexes back and forth in moving water. “At that distance a steel pipeline basically turns into a noodle.”
  • Ed Koller
    posted about this on Facebook 2017-12-22 09:49:09 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Edward Koller
    signed 2017-12-22 09:48:44 -0500
    Line 5 is operating at far greater capacity than originally permitted and at far greater longevity than originally engineered. The failure of protective coating, excessive unsupported spans and Enbridge’s active efforts to suppress the facts suggest that failure, while not imminent, is inevitable. In addition, let us not forget that Enbridge is responsible for the largest oil spill in America which caused lingering contamination of the Kalamazoo river.

    Please, for the sake of the Great Lakes, the Straits of Mackinaw and the people whose lives are intertwined with this body of fresh water, SHUT IT DOWN.
  • Margaret Sloan
    followed this page 2017-12-22 09:48:39 -0500
  • Diane Klarich
    signed 2017-12-22 09:46:40 -0500
    This line needs to be shut down now before it breaks and pollutes the Great Lakes

    Diane Klarich
  • Doug Levack
    signed 2017-12-22 09:45:43 -0500
    Since Line 5 has been in use much longer than it’s intended design, it has exceeded it’s life. The design criteria is no longer valid and the aged pipe and supports must not be allowed to “run to fail”.
  • Kim Wilcox-Olsen
    posted about this on Facebook 2017-12-22 09:44:42 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Ron Chelland
    signed 2017-12-22 09:44:04 -0500
  • Kimberly Wilcox-Olsen
    signed via 2017-12-22 09:44:00 -0500
    Permanently shut down line 5. It’s the only safe, acceptable option. Let’s put our environment and our people above profits.
  • John Hagen
    signed 2017-12-22 09:42:58 -0500
  • Robert Dunn
    signed 2017-12-22 09:41:51 -0500
    Asian Carp, oil, zebra mussels, and many more pollutants destroying our Great Lakes we need strong advocates leading our state not leaders owned by irresponsible corporations.
  • Linda Howard
    signed 2017-12-22 09:39:29 -0500
    Stop line 5 – our Great Lakes are too important to be jeopardised.
  • William Northway
    signed 2017-12-22 09:39:27 -0500
    We all KNOW that your pipeline is going to fail inevitably; that is not an acceptable option. Are you going to be a savior or a polluter; this is a binary choice. What will it be? I can assure you of one thing: I will not stop fighting until the pipeline is out of reach of the Great Lakes.
  • Sarah Sterenberg
    signed 2017-12-22 09:38:33 -0500
    Time to shut Dow the pipeline and keep our Lake safe.
  • mario maraldo
    signed 2017-12-22 09:37:53 -0500
    mario maraldo Time to shut it down.
  • Marilyn Alvey
    signed 2017-12-22 09:37:21 -0500
    Risking an oil spill in our precious Great Lakes is not an option. This line needs to be shut down.
  • nancy jarvis
    signed 2017-12-22 09:36:46 -0500
    gary jarvis
  • Ohyoon Kim
    signed 2017-12-22 09:36:07 -0500
  • Janis Frazee
    signed 2017-12-22 09:34:51 -0500
    Please shut down pipeline 5 now. You must protect the Great Lakes which are one of the nations most valuable natural resources. Without clean protected water, we humans cannot exist for long. Please do the right thing for us and for future generations. Thank you.
  • Nancy Cunningham
    signed 2017-12-22 09:34:12 -0500
    Line 5 threatens the largest body of fresh water in the world. It is imperative that it is shut down.
  • Lissa Spitz
    signed 2017-12-22 09:34:08 -0500
    Please decommission and shut down this recklessly risky line immediately.
  • Diana Jasser
    signed 2017-12-22 09:33:50 -0500
  • Emilie Baker
    signed 2017-12-22 09:33:34 -0500
    The potential harm resulting from an oil spill cannot be calculated and is extremely troubling to we Michigan residents. One cannot escape thinking about the poisoned water in Flint and the resulting damage. We hold Gov. Snyder and government officials responsible for protecting “we the people” now and in the future.

    Emilie Baker
  • Karen Whitman
    @whitmakl14 tweeted link to this page. 2017-12-22 09:33:15 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5. http://www.oilandwaterdontmix.org/submit_your_line_5_comment?recruiter_id=11009
  • Karen Whitman
    signed 2017-12-22 09:33:02 -0500
    Line 5 needs to be shut down NOW. Very disturbing to hear of the governor’s secret deal with Enbridge. Shame on them.
  • Donna Kensa
    signed 2017-12-22 09:32:24 -0500
    I am amazed that the government still does not look at this as a big threat to the great lakes. It would be huge if this pipeline would break in rune are great lakes.
  • Danielle LaVaque-Manty
    signed 2017-12-22 09:32:17 -0500
  • Thomas Hickey
    signed 2017-12-22 09:31:22 -0500
    🌍🐟🌲🌱🦅🦆🦎🦉🦀🦌🌸🌎…..Please protect OUR Great Lakes
  • Hadley Couraud
    signed 2017-12-22 09:31:03 -0500

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates