Line 5 Case Heads to the US Supreme Court
Before the Line 5 case about protecting Michigan's public trust begins, the Enbridge vs. Nessel case is headed to the U.S. Supreme Court for a hearing.
Share
Line 5 at the Supreme Court Crossroads Webinar
Watch the recording of the February 10, 2026, webinar featuring Riaz Kanji for a deep dive into current Line 5 legal proceedings, from the State to the U.S.…
Share
Big Oil vs Big Water Webinar
Enjoy the November 18, 2025, recording of Big Oil vs. Big Water - a solid overview of the status of the work to shut down Line 5: North…
Share
The Line 5 Tunnel: A Dangerous Gamble for Our Great Lakes
Learn what Enbridge is not telling you about its proposed oil tunnel for the Line 5 crude oil pipeline.
Share
End of the Line Webinar
Unstable rock laced with explosive methane is the geology through which Enbridge wants to blast and drill a 4-mile-long oil tunnel in the heart of the planet's lush…
Share
Public Blasts Contractors at MSCA Meeting
The public was out in full force to call into question the oversight on the proposed Canadian Oil Tunnel as it was revealed contractor failures and ties to…
Share