Take Action

Add your name to these public comments to be submitted to MDEQ by signing this petition.

OWDMTake Action Now

Michigan’s year-long study of Line 5 alternatives has been released. Now is the time to submit your comment calling for the only way to truly protect the Great Lakes from an oil spill: decommission the Enbridge Line 5 pipelines through the Straits of Mackinac.

Protect the Great Lakes from a Catastrophic Oil Spill

Deadline for comments is August 4, so please submit yours today via this online form in support of protecting the Great Lakes from a catastrophic oil spill.

To the Michigan Department of Environmental Quality, Michigan Agency for Energy, Michigan Department of Natural Resources, and Office of the Attorney General:

I am writing to submit my official comment in response to the State of Michigan’s Line 5 alternatives analysis. This report was expressly commissioned for the overall purpose of “providing the State, Enbridge and the public with information that can be used to help guide decisions for the future of [Line 5 in the Straits].”

I am deeply disappointed in this analysis and this process riddled with conflict of interest. It lacks credibility because Dynamic Risk, a firm with ties to Enbridge, is its author. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An expert review in December 2015 by advisors to a Great Lakes policy organization documented the practicality of this alternative.

Decommissioning Line 5 in the Straits of Mackinac is the only alternative that will prevent an oil spill with catastrophic consequences for the Great Lakes and the State of Michigan. It is time for the state to stop delaying action with flawed studies, exercise its legal duty as public trustee, and shut down Line 5. The state should use that authority through enforcement of its easement, an agreement that Enbridge has consistently violated. 

Specifically, the draft report on alternatives to Line 5 in the Mackinac Straits:

  1. Fails to follow the recommendations and standards outlined in the Michigan Petroleum Pipeline Task Force Report and should be withdrawn.
  2. Neglects to provide the state with an independent, fair analysis of the alternatives to Line 5. This report is clearly biased toward allowing Line 5 to continue to operate and/or allowing Enbridge to build new oil infrastructure and further expand its operations. That bias grows out of past, and potentially future, business relationships between Enbridge and the report’s authors. Clearly, the authors are not “wholly independent from any influence by Enbridge,” a standard for establishing credibility in the report’s findings that is outlined in the Task Force Report.
  3. Ignores using existing pipeline infrastructure as an alternative to Line 5 in the Straits, which was one of the alternatives the state required Dynamic Risk to analyze, and leaving it out is in conflict with Task Force recommendation 3 (b). It is unacceptable that the contractor eliminated this alternative in the early stages of analysis, and this must be remedied in the final report.
  4. Does not provide a worst-case scenario spill and cost analysis, which was one of the main objectives of this report and was specifically required by the state in its request for proposals under Section II-B. Instead, Dynamic Risk uses assumptions of risk that are woefully inadequate and are not credible. It estimates that:
    • Only 20-miles of shoreline would be impacted by a spill. This is 3% of the 720-mile area the University of Michigan found vulnerable to a spill in its 2016 study.
    • An oil spill would cost $100 to $200 million when Enbridge’s cleanup costs of its Kalamazoo River Line 6B pipeline oil spill in 2010 cost more than $1.2 billion.
  5. Overestimates an impact to propane supply, greatly exceeding what independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary, while another study found it would take only one railcar or 3 - 4 truckloads per day to replace Line 5 propane supply to the U.P.
  6. Shows unfair bias towards building a tunneled pipeline. The report estimates the cost of a tunnel much lower than other estimates for this type of infrastructure; it fails to consider the risk of a spill to the Great Lakes, rivers and streams from other portions of the 64-year-old pipeline if the Straits portion were rebuilt; and it fails to look at the other health and environmental consequences of allowing Enbridge to build a tunnel and further expand its transport of mostly Canadian oil through Michigan for export. Dynamic Risk has a preference for new pipelines, which was evident when the firm aggressively promoted building a tunnel in its proposal to do this report, and its analysis is deeply flawed.

The magnitude of the risk of a spill is too severe to allow Line 5 to continue to operate in the Great Lakes. Michigan should not put the Great Lakes, our economy, health, drinking water, fisheries, and way of life at risk from a catastrophic oil spill any longer.

I urge you to act as legal public trustees of our waters and bottomlands, enforce the ongoing easement violations, and begin the process of decommissioning Line 5 in the Straits of Mackinac to protect the Great Lakes from a catastrophic oil spill. The State of Michigan has an independent legal duty to take this enforcement action based on Enbridge’s ongoing violations.

Please note that submitting your public comment here has nothing to do with the Line 5 ballot proposal that is being circulated.

 

9,830 COMMENTS
Help Reach the Next Goal: 11,000 comments

Will you submit your comment?

or Text SHUTDOWN to +12314804112 to sign or Text FINAL to +12314804112 to sign

Showing 7651 reactions

  • Karen Moore
    signed via 2017-07-31 18:03:52 -0400
  • Sarah Stallings
    posted about this on Facebook 2017-07-31 18:01:53 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Lola Janes
    signed via 2017-07-31 18:00:44 -0400
  • Noah Korenchuk
    signed 2017-07-31 17:59:21 -0400
  • Dawn Hightree
    signed via 2017-07-31 17:53:06 -0400
    please understand we will die if we keep polluting.
  • Matt Heintzkill
    signed 2017-07-31 17:49:01 -0400
    I live in Kalamazoo Michigan. One Enbridge disaster is enough. They don’t care about our state. They care about revenues at our expense.

    Let’s live up to our slogan"Pure Michigan". Do our politicians really want to see “Sorry beach closings”due to massive oil slick,

    “No Fishing” contaminated fish. How will you convince tourists to visit oil saturated beaches? I can assure you Enbridge won’t clean it up the mess.

    Tom Heintzkill
  • Elizabeth Simon
    signed via 2017-07-31 17:46:29 -0400
  • Alexandra Blüml
    signed 2017-07-31 17:43:46 -0400
    Alexandra Blüml
  • Colleen Kaczmarek
    signed via 2017-07-31 17:42:25 -0400
    Colleen Kaczmarek: What she said…. shut it down and research alternatives.
  • Susan Lawrence
    signed via 2017-07-31 17:38:52 -0400
  • Angie Pierce
    posted about this on Facebook 2017-07-31 17:38:48 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Tammy Hibner
    signed via 2017-07-31 17:38:35 -0400
  • Melanie Murphy
    posted about this on Facebook 2017-07-31 17:37:44 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Shannon Thor
    posted about this on Facebook 2017-07-31 17:37:42 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Shannon Thor
    signed via 2017-07-31 17:37:31 -0400
    Shannon Thor
  • Andrew Start
    signed 2017-07-31 17:36:10 -0400
    Protect our land first and route your oil second. It’s not our fault not enough research or technology was not around what gen this “line 5” was first put in place, but it is your fault for not fixing a disaster waiting to happen.
  • Hayley Skinner
    posted about this on Facebook 2017-07-31 17:34:37 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Hayley Skinner
    signed via 2017-07-31 17:34:15 -0400
  • Dana Montague
    posted about this on Facebook 2017-07-31 17:32:17 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Dana Montague
    signed via 2017-07-31 17:31:38 -0400
  • John Carver
    signed via 2017-07-31 17:31:07 -0400
  • Kathryn Walker
    signed 2017-07-31 17:29:38 -0400
    Don’t risk the health and welfare of the great lakes and its loving residents! SHUT DOWN LINE 5!
  • Nancy Verlinde
    signed via 2017-07-31 17:29:26 -0400
  • Tom Baker
    signed 2017-07-31 17:28:04 -0400
    This situation needs to be remedied immediately! By refusing to take action, you are allowing a private corporation to gain private profits, whereas when the pipe ruptures, it will be the taxpayers who pay for the cleanup, which could never restore the status quo ante. As public servants, you are obliged to act now! Or you will have Flint all over again, on a far greater scale. Consider the extent of possible civil and criminal actions that might be filed against you!!
  • Anne Harlow
    signed via 2017-07-31 17:27:43 -0400
  • David Newman
    signed 2017-07-31 17:27:30 -0400
    The line needs to be shut down ASAP.
  • Keith Kleber
    signed 2017-07-31 17:25:43 -0400
  • Aliesha Kuhlman
    posted about this on Facebook 2017-07-31 17:18:06 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Aliesha Kuhlman
    signed via 2017-07-31 17:17:41 -0400
    Have the morals and values to do what is right, shut it down!
  • Timothy Smith
    signed 2017-07-31 17:16:32 -0400

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates