Take Action

Add your name to these public comments to be submitted to MDEQ by signing this petition.

OWDMTake Action Now

Michigan’s year-long study of Line 5 alternatives has been released. Now is the time to submit your comment calling for the only way to truly protect the Great Lakes from an oil spill: decommission the Enbridge Line 5 pipelines through the Straits of Mackinac.

Protect the Great Lakes from a Catastrophic Oil Spill

Deadline for comments is August 4, so please submit yours today via this online form in support of protecting the Great Lakes from a catastrophic oil spill.

To the Michigan Department of Environmental Quality, Michigan Agency for Energy, Michigan Department of Natural Resources, and Office of the Attorney General:

I am writing to submit my official comment in response to the State of Michigan’s Line 5 alternatives analysis. This report was expressly commissioned for the overall purpose of “providing the State, Enbridge and the public with information that can be used to help guide decisions for the future of [Line 5 in the Straits].”

I am deeply disappointed in this analysis and this process riddled with conflict of interest. It lacks credibility because Dynamic Risk, a firm with ties to Enbridge, is its author. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An expert review in December 2015 by advisors to a Great Lakes policy organization documented the practicality of this alternative.

Decommissioning Line 5 in the Straits of Mackinac is the only alternative that will prevent an oil spill with catastrophic consequences for the Great Lakes and the State of Michigan. It is time for the state to stop delaying action with flawed studies, exercise its legal duty as public trustee, and shut down Line 5. The state should use that authority through enforcement of its easement, an agreement that Enbridge has consistently violated. 

Specifically, the draft report on alternatives to Line 5 in the Mackinac Straits:

  1. Fails to follow the recommendations and standards outlined in the Michigan Petroleum Pipeline Task Force Report and should be withdrawn.
  2. Neglects to provide the state with an independent, fair analysis of the alternatives to Line 5. This report is clearly biased toward allowing Line 5 to continue to operate and/or allowing Enbridge to build new oil infrastructure and further expand its operations. That bias grows out of past, and potentially future, business relationships between Enbridge and the report’s authors. Clearly, the authors are not “wholly independent from any influence by Enbridge,” a standard for establishing credibility in the report’s findings that is outlined in the Task Force Report.
  3. Ignores using existing pipeline infrastructure as an alternative to Line 5 in the Straits, which was one of the alternatives the state required Dynamic Risk to analyze, and leaving it out is in conflict with Task Force recommendation 3 (b). It is unacceptable that the contractor eliminated this alternative in the early stages of analysis, and this must be remedied in the final report.
  4. Does not provide a worst-case scenario spill and cost analysis, which was one of the main objectives of this report and was specifically required by the state in its request for proposals under Section II-B. Instead, Dynamic Risk uses assumptions of risk that are woefully inadequate and are not credible. It estimates that:
    • Only 20-miles of shoreline would be impacted by a spill. This is 3% of the 720-mile area the University of Michigan found vulnerable to a spill in its 2016 study.
    • An oil spill would cost $100 to $200 million when Enbridge’s cleanup costs of its Kalamazoo River Line 6B pipeline oil spill in 2010 cost more than $1.2 billion.
  5. Overestimates an impact to propane supply, greatly exceeding what independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary, while another study found it would take only one railcar or 3 - 4 truckloads per day to replace Line 5 propane supply to the U.P.
  6. Shows unfair bias towards building a tunneled pipeline. The report estimates the cost of a tunnel much lower than other estimates for this type of infrastructure; it fails to consider the risk of a spill to the Great Lakes, rivers and streams from other portions of the 64-year-old pipeline if the Straits portion were rebuilt; and it fails to look at the other health and environmental consequences of allowing Enbridge to build a tunnel and further expand its transport of mostly Canadian oil through Michigan for export. Dynamic Risk has a preference for new pipelines, which was evident when the firm aggressively promoted building a tunnel in its proposal to do this report, and its analysis is deeply flawed.

The magnitude of the risk of a spill is too severe to allow Line 5 to continue to operate in the Great Lakes. Michigan should not put the Great Lakes, our economy, health, drinking water, fisheries, and way of life at risk from a catastrophic oil spill any longer.

I urge you to act as legal public trustees of our waters and bottomlands, enforce the ongoing easement violations, and begin the process of decommissioning Line 5 in the Straits of Mackinac to protect the Great Lakes from a catastrophic oil spill. The State of Michigan has an independent legal duty to take this enforcement action based on Enbridge’s ongoing violations.

Please note that submitting your public comment here has nothing to do with the Line 5 ballot proposal that is being circulated.

 

9,830 COMMENTS
Help Reach the Next Goal: 11,000 comments

Will you submit your comment?

or Text SHUTDOWN to +12314804112 to sign or Text FINAL to +12314804112 to sign

Showing 7651 reactions

  • Blondell Doughty
    signed 2017-07-10 14:34:29 -0400
  • Jeanine Deal
    signed 2017-07-10 14:34:08 -0400
    Please shut-down Line 5. Thank you.
  • Cheryl Bogner
    signed 2017-07-10 14:33:35 -0400
    We must protect the largest fresh water supply in the world, our Great Lakes. We can take no chances of any oil spill. Decommission Line 5 pipelines through the Straits of Mackinac.
  • Jodie Glessner
    posted about this on Facebook 2017-07-10 14:33:34 -0400
    It's up to us to tell the State of Michigan the only acceptable way to protect the Great Lakes is SHUTDOWN LINE 5.
  • Cheryl Barget
    signed 2017-07-10 14:32:46 -0400
    This is the largest fresh water source for the entire US. Not to mention the effect on Canada. We can’t take chances like this. We should protect this water source completely.
  • Jodie Glessner
    signed 2017-07-10 14:32:36 -0400
  • Joseph Suarez
    signed 2017-07-10 14:31:21 -0400
  • Pat Wilkins
    posted about this on Facebook 2017-07-10 14:30:01 -0400
    It's up to us to tell the State of Michigan the only acceptable way to protect the Great Lakes is SHUTDOWN LINE 5.
  • Patricia Wilkins
    signed 2017-07-10 14:29:11 -0400
    The Great Lakes are Michigan’s greatest asset. The continuing peril of pipeline No.5 is wrong, negligent and stupid. We have alternatives. Stop delaying the shutdown of this pipeline.
  • Gretchen Turonek
    signed 2017-07-10 14:27:54 -0400
  • Kathryn Foyle
    signed 2017-07-10 14:19:40 -0400
  • Ruth Mutchler
    signed 2017-07-10 14:18:08 -0400
  • Joe Ziolkowski
    signed 2017-07-10 14:18:02 -0400
  • Sheldon Keitel
    signed 2017-07-10 14:15:45 -0400
    I am writing to submit my official comment in response to the State of Michigan’s Line 5 alternatives analysis. This report was expressly commissioned for the overall purpose of “providing the State, Enbridge and the public with information that can be used to help guide decisions for the future of [Line 5 in the Straits].”


    I am deeply disappointed in this analysis and this process riddled with conflict of interest. It lacks credibility because Dynamic Risk, a firm with ties to Enbridge, is its author. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An expert review in December 2015 by advisors to a Great Lakes policy organization documented the practicality of this alternative.
  • Wendy Ballard
    signed 2017-07-10 14:14:13 -0400
    Stop line 5
  • Monique Musialowski
    signed 2017-07-10 14:12:31 -0400
  • Pam Borquez
    signed 2017-07-10 14:09:51 -0400
  • Kathleen Field
    signed 2017-07-10 14:08:56 -0400
  • Robert Aguirre
    posted about this on Facebook 2017-07-10 14:08:50 -0400
    It's up to us to tell the State of Michigan the only acceptable way to protect the Great Lakes is SHUTDOWN LINE 5.
  • Stephanie Morreale
    signed 2017-07-10 14:01:31 -0400
    Please protect the Great Lakes!!!
  • Lisa Barrett
    signed 2017-07-10 14:00:12 -0400
    Please begin to decommission Line 5 immediately.People and the health of our Great Lakes should come before corporations and profits.
  • Anna Allen
    posted about this on Facebook 2017-07-10 13:58:55 -0400
    It's up to us to tell the State of Michigan the only acceptable way to protect the Great Lakes is SHUTDOWN LINE 5.
  • Anna Allen
    signed 2017-07-10 13:58:19 -0400
  • Lara Post
    signed 2017-07-10 13:57:17 -0400
  • James Haldy
    signed 2017-07-10 13:55:04 -0400
  • Pam Kies-lowe
    signed 2017-07-10 13:53:49 -0400
    The risk to our Great Lakes is just too big to take any chance with this or other pipelines!
  • Lori Rochette
    signed 2017-07-10 13:53:47 -0400
    It’s just too risky to our vital waters and fertile lands.
  • Gerald Fortuna
    signed 2017-07-10 13:52:36 -0400
    shutdown the pipeline under the mackinaw bridge the danger is to high to take a risk on keeping it going
  • Toni Miechiels
    signed 2017-07-10 13:51:32 -0400
    SHUT IT DOWN
  • Jeanine Center
    signed 2017-07-10 13:46:02 -0400
    Have we learned nothing from the horrendous Enbridge pipeline spill into the Kalamazoo River?

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates