Take Action
Add your name to these public comments to be submitted to MDEQ by signing this petition.
Take Action Now
Michigan’s year-long study of Line 5 alternatives has been released. Now is the time to submit your comment calling for the only way to truly protect the Great Lakes from an oil spill: decommission the Enbridge Line 5 pipelines through the Straits of Mackinac.
Protect the Great Lakes from a Catastrophic Oil Spill
Deadline for comments is August 4, so please submit yours today via this online form in support of protecting the Great Lakes from a catastrophic oil spill.
To the Michigan Department of Environmental Quality, Michigan Agency for Energy, Michigan Department of Natural Resources, and Office of the Attorney General:
I am writing to submit my official comment in response to the State of Michigan’s Line 5 alternatives analysis. This report was expressly commissioned for the overall purpose of “providing the State, Enbridge and the public with information that can be used to help guide decisions for the future of [Line 5 in the Straits].”
I am deeply disappointed in this analysis and this process riddled with conflict of interest. It lacks credibility because Dynamic Risk, a firm with ties to Enbridge, is its author. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An expert review in December 2015 by advisors to a Great Lakes policy organization documented the practicality of this alternative.
Decommissioning Line 5 in the Straits of Mackinac is the only alternative that will prevent an oil spill with catastrophic consequences for the Great Lakes and the State of Michigan. It is time for the state to stop delaying action with flawed studies, exercise its legal duty as public trustee, and shut down Line 5. The state should use that authority through enforcement of its easement, an agreement that Enbridge has consistently violated.
Specifically, the draft report on alternatives to Line 5 in the Mackinac Straits:
- Fails to follow the recommendations and standards outlined in the Michigan Petroleum Pipeline Task Force Report and should be withdrawn.
- Neglects to provide the state with an independent, fair analysis of the alternatives to Line 5. This report is clearly biased toward allowing Line 5 to continue to operate and/or allowing Enbridge to build new oil infrastructure and further expand its operations. That bias grows out of past, and potentially future, business relationships between Enbridge and the report’s authors. Clearly, the authors are not “wholly independent from any influence by Enbridge,” a standard for establishing credibility in the report’s findings that is outlined in the Task Force Report.
- Ignores using existing pipeline infrastructure as an alternative to Line 5 in the Straits, which was one of the alternatives the state required Dynamic Risk to analyze, and leaving it out is in conflict with Task Force recommendation 3 (b). It is unacceptable that the contractor eliminated this alternative in the early stages of analysis, and this must be remedied in the final report.
-
Does not provide a worst-case scenario spill and cost analysis, which was one of the main objectives of this report and was specifically required by the state in its request for proposals under Section II-B. Instead, Dynamic Risk uses assumptions of risk that are woefully inadequate and are not credible. It estimates that:
- Only 20-miles of shoreline would be impacted by a spill. This is 3% of the 720-mile area the University of Michigan found vulnerable to a spill in its 2016 study.
- An oil spill would cost $100 to $200 million when Enbridge’s cleanup costs of its Kalamazoo River Line 6B pipeline oil spill in 2010 cost more than $1.2 billion.
- Overestimates an impact to propane supply, greatly exceeding what independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary, while another study found it would take only one railcar or 3 - 4 truckloads per day to replace Line 5 propane supply to the U.P.
- Shows unfair bias towards building a tunneled pipeline. The report estimates the cost of a tunnel much lower than other estimates for this type of infrastructure; it fails to consider the risk of a spill to the Great Lakes, rivers and streams from other portions of the 64-year-old pipeline if the Straits portion were rebuilt; and it fails to look at the other health and environmental consequences of allowing Enbridge to build a tunnel and further expand its transport of mostly Canadian oil through Michigan for export. Dynamic Risk has a preference for new pipelines, which was evident when the firm aggressively promoted building a tunnel in its proposal to do this report, and its analysis is deeply flawed.
The magnitude of the risk of a spill is too severe to allow Line 5 to continue to operate in the Great Lakes. Michigan should not put the Great Lakes, our economy, health, drinking water, fisheries, and way of life at risk from a catastrophic oil spill any longer.
I urge you to act as legal public trustees of our waters and bottomlands, enforce the ongoing easement violations, and begin the process of decommissioning Line 5 in the Straits of Mackinac to protect the Great Lakes from a catastrophic oil spill. The State of Michigan has an independent legal duty to take this enforcement action based on Enbridge’s ongoing violations.
Please note that submitting your public comment here has nothing to do with the Line 5 ballot proposal that is being circulated.
Showing 7651 reactions
May God have mercy on our souls,
if we continue to allow Money over people and Natural Resources.
ENBRIDGE’S TRACK RECORD SHOULD SPEAK FOR IT’S SELF!
IGNORING OR DOWN PLAYING ISSUES,
COVER UPS,
DELAY RESPONSE,
IMPROPER CLEAN UP,
PERMIT VIOLATIONS,
JUST TO NAME A FEW.
How quickly we forget!
Enbridge had the largest inland oil spill to this day. The numerous effects of the delayed response of Enbridge, are stilling being felt in Kalamazoo and the surrounding communities.
Just like with the Flint Water crises, ignorance is not bless, and hindsight is 20/20.
Line 5 is a ticketing time bomb! (see links)
Which could go off at any given time, without warning?
When, not if Line 5 go’s, it would have catastrophic consequences, this time not just a few communities being affected, this time two countries.
With numerous individuals,families of all walks of life, plus countless wildlife and aquatic plants,fish and animals.
Just imagine the impact of an oil spill on the livelihoods of those who depend on the lakes for tourism, boating, fishing, food and enjoyment.
Why, would we gamble with a natural resource that
you cannot make more of??
When numerous states and countries are experiencing droughts?
Get ready Tim Allen,Instead of Pure Michigan,
it would be Polluted Michigan.
Some how that doesn’t sound as nice.
Let’s bring back commonsense and protect our natural Resources.
( I give all credit to the individual YouTube sites for their videos)
https://youtu.be/DtQH—7T—c
https://youtu.be/eL0Njjz1JNQ
https://youtu.be/-20-Yl-Ew7c
https://youtu.be/1X3VynNZQaQ(a different look)
p.s. That also go’s for NO Nuclear waste in any form in our lakes, shores, waterways or roadways.
Thank you
Venessa Davis
One of the Manning victims affect by Enbridge and Sunoco Logistics.
It would be catastrophic on so many levels.