Take Action

Add your name to these public comments to be submitted to Michigan state agencies by signing this petition.

PLEASE NOTE! The State of Michigan has closed the comment period. You may still sign the petition here, but the State of Michigan will not recieve your comment.

OWDMTake Action Now

Last June, the preliminary Line 5 Alternatives Study was released, and more than 23,000 people submitted their comment calling for the shutdown of Line 5 as the only alternative that will truly protect the Great Lakes from an oil spill. The revised and final Alternatives Study has just been released, which has triggered a second comment period that is now open.

Prevent a Catastrophic Great Lakes Oil Spill

The deadline for public comments is December 22, 2017, so please sign on and submit your comment today via this online form. Let's prevent a devastating oil spill in the Straits of Mackinac.

To the Michigan Department of Environmental Quality, Michigan Agency for Energy, Michigan Department of Natural Resources, Michigan Governor, Michigan Attorney General, and Michigan Pipeline Safety Advisory Board:

I am writing to submit my official comment in response to the State of Michigan’s Line 5 final alternatives analysis dated October 26 and released on November 20. I am deeply disappointed in this final analysis. A draft alternatives report released in June was riddled with errors and omissions, and the final report contains most of the same failures.

This report fails to meet its overall purpose of “providing the State of Michigan and other interested parties with an independent, comprehensive analysis of alternatives to the existing Straits Pipelines, and the extent to which each alternative promotes the public health, safety, and welfare and protects the public trust resources of the Great Lakes.”

It lacks credibility because its author is Dynamic Risk, a firm with ties to Enbridge, the Canadian energy transport company that owns Line 5. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An independent expert review in December 2015 documented the practicality of this alternative.

Decommissioning Line 5 in the Straits of Mackinac is the only alternative that will prevent an oil spill with catastrophic consequences for the Great Lakes and the State of Michigan. Moreover, this final alternative report affirms that decommissioning is a feasible option with zero risks to the Great Lakes and minimal economic impacts to Michigan customers (e.g., two cents more at the gas pump and roughly 10 to 25 cents more for propane in the Upper Peninsula). 
 
It is time for the state to reject the flawed study, exercise its affirmative legal duty as public trustee of the Great Lakes and bottomlands, and shut down Line 5. The state should use that authority to revoke the 1953 easement agreement that Enbridge has consistently violated.

The risk of a spill is too great to allow Line 5 to continue to operate in the Great Lakes. Our state government should not put the Great Lakes, our economy, health, drinking water, fisheries, and way of life at risk from a catastrophic oil spill any longer. In fact, on November 16, the Coast Guard Coast commandant testified again to Congress that his agency is not prepared to clean up a large-scale pipeline oil spill in the Great Lakes.

I urge you to act as public trustees of our waters and bottomlands, enforce the easement in light of Enbridge’s ongoing violations, and begin the process of decommissioning Line 5 in the Straits of Mackinac to protect the Great Lakes from a catastrophic oil spill. The State of Michigan has a legal duty to take this enforcement action. Enbridge’s ongoing violations cannot be remedied. It is time for the state to act decisively and with urgency.

Specifically, the report on alternatives to Line 5 in the Mackinac Straits:

  1. Fails to follow the recommendations and standards outlined in the Michigan Petroleum Pipeline Task Force Report, which resulted from a process created by the governor and co-chaired by the attorney general, and therefore cannot be used by the State of Michigan “in making decisions about the future of the Straits Pipelines.”
  2. Neglects to provide the state with an independent, fair analysis of the alternatives to Line 5 as required by the Task Force Report. This final report remains biased toward allowing Line 5 to continue to operate and/or allowing Enbridge to build new oil infrastructure in the Straits of Mackinac and further expand its operations. That bias grows out of past, and potentially future, business relationships between Enbridge and the report’s authors.
  3. Fails to analyze existing pipeline infrastructure as an alternative to Line 5 in the Straits, which the state required Dynamic Risk to analyze, and leaving it out conflicts with Task Force recommendation 3 (b). It is unacceptable that the contractor eliminated this alternative without any analysis. The 1953 easement granted with strict conditions by the state to Enbridge does not guarantee transport of 540,000 barrels per day (bpd) of oil and natural gas liquids. In fact, the 1953 MPSC Order states 300,000 bpd, which means Enbridge is currently operating Line 5 at 80 percent over design capacity. 
  4. Fails to analyze new evidence disclosed by Enbridge affecting the pipeline’s integrity, including external corrosion, 48 bare metal spots caused by the installation of screw anchors, compromised cathodic protection, and historic excessive pipeline spans greater than the 75-feet limit (including a 286-foot span that was unsupported for years), as required by the legal operating agreement with the State of Michigan. Dynamic Risk’s rationale, in part, is that "it would be inappropriate to speculate on any of the above aspects of the coating condition."
  5. Fails to consider tribal sovereign treaty rights and feedback on the basis that Dynamic Risk was not a party to tribal and state consultations, which is an unacceptable dismissal of input by a key stakeholder. 
  6. Grossly underestimates the total economic spill costs at between $147 million and $310 million, when Enbridge’s cleanup costs of its 2010 Line 6B pipeline oil spill along a 40-mile stretch of the Kalamazoo River cost more than $1.2 billion.
  7. Overestimates an impact to propane supply, greatly exceeding what independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary, while another study found it would take only one railcar or 3 - 4 truckloads per day to replace the Line 5 propane supply to the U.P.
  8. Continues to show an unfair bias towards building a tunneled pipeline in the Mackinac Straits. The report estimates a much lower cost for a tunnel than other estimates for this type of infrastructure; it fails to consider the risk of a spill to the Great Lakes, rivers and streams from other portions of the 64-year-old pipeline if the Straits portion were rebuilt. Dynamic Risk prefers new pipelines, which was evident when the firm aggressively promoted building a tunnel in its proposal to do this report, and its analysis is deeply flawed.

 

5,363 COMMENTS
Help Reach the Next Goal: 6,000 comments

Will you submit your comment?

or Text PROTECT to +12314804112 to sign or Text PROTECT! to +12314804112 to sign

Showing 3503 reactions

  • Franklin Alexander
    signed via 2017-12-20 07:33:50 -0500
  • Sheryll Blaschak
    signed via 2017-12-20 07:08:16 -0500
    Shut it down.
  • Ina Kline
    signed via 2017-12-20 06:35:47 -0500
  • paula curry
    posted about this on Facebook 2017-12-20 06:23:45 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Veronika Schultz
    signed via 2017-12-20 06:07:22 -0500
  • Janice Tierney
    signed via 2017-12-20 05:45:34 -0500
    Janice Tierney
  • Cindy Charters
    posted about this on Facebook 2017-12-20 04:57:31 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Cynthia Charters
    signed via 2017-12-20 04:57:16 -0500
    I’m not aware of any oil pipeline that doesn’t experience leaks. Profit should not take priority over public safety, preserving water quality and the environment. Please make the right decision and shut down Line 5.
  • Jake Turkman
    posted about this on Facebook 2017-12-20 04:20:13 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • John Margerum
    signed via 2017-12-20 04:19:58 -0500
    Water is life. leave the oil in the ground.
  • Terri Walsh
    posted about this on Facebook 2017-12-20 04:12:18 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Terri Walsh
    @TerriWa38278797 tweeted link to this page. 2017-12-20 04:12:15 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5. http://www.oilandwaterdontmix.org/submit_your_line_5_comment?recruiter_id=35322
  • Terri Walsh
    signed via 2017-12-20 04:11:52 -0500
    Decommission Enbridge Line 5!
  • Andrea Johnson
    signed via 2017-12-20 04:05:08 -0500
    Decommission Line 5 now!
  • Mike Denunzio
    signed 2017-12-20 03:34:10 -0500
  • Margot Haynes
    posted about this on Facebook 2017-12-20 02:56:22 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Margot Haynes
    signed via 2017-12-20 02:56:11 -0500
    The risk we are taking to our future health, tourism, economy as a whole, is too much. Enforce the law that Enbridge has violated and shut it down!
  • Julie Wilhelmi
    posted about this on Facebook 2017-12-20 01:21:34 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Julie Wilhelmi
    signed via 2017-12-20 01:21:19 -0500
    The oil being pushed through this pipeline is a lot more corrosive and thick than it used to be. Meanwhile, the pipeline is way passed it’s expiration date and should’ve been reworked or taken down over a decade ago. People of Michigan, and people all over the country, who rely on drinking water from the great lakes are being put in serious danger. Our lawmakers are putting the needs of corporations and their greed before the well being of HUMAN beings! The irony here is (some of them) they are humans too… I don’t understand this lack of logic and common sense. I don’t understand why so many politicians want to use the Earth up so fast, almost like they’re purposefully trying to end the world and the human race living on it.
  • Daniel Bolthouse
    signed via 2017-12-20 01:17:17 -0500
    Who is gonna benefit from this?? The oil company and anyone who is associated with this..that’s who. Are the hard working people of Michigan, who bust their asses at jobs they probably don’t like, ever gonna see a dime from this?? I think not!! Shut down Line 5 and keep Michigan the great state it is and always will be.
  • Jared Boot-Haury
    signed via 2017-12-20 01:08:25 -0500
  • Janine Dulac
    signed 2017-12-20 01:05:41 -0500
  • Elyse Bontrager
    posted about this on Facebook 2017-12-20 00:58:10 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Hannah Marie
    posted about this on Facebook 2017-12-20 00:52:45 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Lucille Mirkle
    signed via 2017-12-20 00:28:26 -0500
  • Chase Gifford
    posted about this on Facebook 2017-12-20 00:28:25 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Chase Gifford
    signed via 2017-12-20 00:28:11 -0500
    We are assuming all the risks with little benefits. Stop Line 5. You can’t drink oil, keep it on the soil. Our Great Lakes will be devastated if this eroding old line breaks. We cannot afford to wait another day.


    STOP LINE 5!
  • Brett Kirch
    signed via 2017-12-20 00:13:23 -0500
  • J. Beverly
    signed via 2017-12-20 00:00:15 -0500
  • Katherine Houston
    signed via 2017-12-19 23:34:37 -0500
    Seriously this has to be stopped.

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates