Take Action

Add your name to these public comments to be submitted to Michigan state agencies by signing this petition.

PLEASE NOTE! The State of Michigan has closed the comment period. You may still sign the petition here, but the State of Michigan will not recieve your comment.

OWDMTake Action Now

Last June, the preliminary Line 5 Alternatives Study was released, and more than 23,000 people submitted their comment calling for the shutdown of Line 5 as the only alternative that will truly protect the Great Lakes from an oil spill. The revised and final Alternatives Study has just been released, which has triggered a second comment period that is now open.

Prevent a Catastrophic Great Lakes Oil Spill

The deadline for public comments is December 22, 2017, so please sign on and submit your comment today via this online form. Let's prevent a devastating oil spill in the Straits of Mackinac.

To the Michigan Department of Environmental Quality, Michigan Agency for Energy, Michigan Department of Natural Resources, Michigan Governor, Michigan Attorney General, and Michigan Pipeline Safety Advisory Board:

I am writing to submit my official comment in response to the State of Michigan’s Line 5 final alternatives analysis dated October 26 and released on November 20. I am deeply disappointed in this final analysis. A draft alternatives report released in June was riddled with errors and omissions, and the final report contains most of the same failures.

This report fails to meet its overall purpose of “providing the State of Michigan and other interested parties with an independent, comprehensive analysis of alternatives to the existing Straits Pipelines, and the extent to which each alternative promotes the public health, safety, and welfare and protects the public trust resources of the Great Lakes.”

It lacks credibility because its author is Dynamic Risk, a firm with ties to Enbridge, the Canadian energy transport company that owns Line 5. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An independent expert review in December 2015 documented the practicality of this alternative.

Decommissioning Line 5 in the Straits of Mackinac is the only alternative that will prevent an oil spill with catastrophic consequences for the Great Lakes and the State of Michigan. Moreover, this final alternative report affirms that decommissioning is a feasible option with zero risks to the Great Lakes and minimal economic impacts to Michigan customers (e.g., two cents more at the gas pump and roughly 10 to 25 cents more for propane in the Upper Peninsula). 
 
It is time for the state to reject the flawed study, exercise its affirmative legal duty as public trustee of the Great Lakes and bottomlands, and shut down Line 5. The state should use that authority to revoke the 1953 easement agreement that Enbridge has consistently violated.

The risk of a spill is too great to allow Line 5 to continue to operate in the Great Lakes. Our state government should not put the Great Lakes, our economy, health, drinking water, fisheries, and way of life at risk from a catastrophic oil spill any longer. In fact, on November 16, the Coast Guard Coast commandant testified again to Congress that his agency is not prepared to clean up a large-scale pipeline oil spill in the Great Lakes.

I urge you to act as public trustees of our waters and bottomlands, enforce the easement in light of Enbridge’s ongoing violations, and begin the process of decommissioning Line 5 in the Straits of Mackinac to protect the Great Lakes from a catastrophic oil spill. The State of Michigan has a legal duty to take this enforcement action. Enbridge’s ongoing violations cannot be remedied. It is time for the state to act decisively and with urgency.

Specifically, the report on alternatives to Line 5 in the Mackinac Straits:

  1. Fails to follow the recommendations and standards outlined in the Michigan Petroleum Pipeline Task Force Report, which resulted from a process created by the governor and co-chaired by the attorney general, and therefore cannot be used by the State of Michigan “in making decisions about the future of the Straits Pipelines.”
  2. Neglects to provide the state with an independent, fair analysis of the alternatives to Line 5 as required by the Task Force Report. This final report remains biased toward allowing Line 5 to continue to operate and/or allowing Enbridge to build new oil infrastructure in the Straits of Mackinac and further expand its operations. That bias grows out of past, and potentially future, business relationships between Enbridge and the report’s authors.
  3. Fails to analyze existing pipeline infrastructure as an alternative to Line 5 in the Straits, which the state required Dynamic Risk to analyze, and leaving it out conflicts with Task Force recommendation 3 (b). It is unacceptable that the contractor eliminated this alternative without any analysis. The 1953 easement granted with strict conditions by the state to Enbridge does not guarantee transport of 540,000 barrels per day (bpd) of oil and natural gas liquids. In fact, the 1953 MPSC Order states 300,000 bpd, which means Enbridge is currently operating Line 5 at 80 percent over design capacity. 
  4. Fails to analyze new evidence disclosed by Enbridge affecting the pipeline’s integrity, including external corrosion, 48 bare metal spots caused by the installation of screw anchors, compromised cathodic protection, and historic excessive pipeline spans greater than the 75-feet limit (including a 286-foot span that was unsupported for years), as required by the legal operating agreement with the State of Michigan. Dynamic Risk’s rationale, in part, is that "it would be inappropriate to speculate on any of the above aspects of the coating condition."
  5. Fails to consider tribal sovereign treaty rights and feedback on the basis that Dynamic Risk was not a party to tribal and state consultations, which is an unacceptable dismissal of input by a key stakeholder. 
  6. Grossly underestimates the total economic spill costs at between $147 million and $310 million, when Enbridge’s cleanup costs of its 2010 Line 6B pipeline oil spill along a 40-mile stretch of the Kalamazoo River cost more than $1.2 billion.
  7. Overestimates an impact to propane supply, greatly exceeding what independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary, while another study found it would take only one railcar or 3 - 4 truckloads per day to replace the Line 5 propane supply to the U.P.
  8. Continues to show an unfair bias towards building a tunneled pipeline in the Mackinac Straits. The report estimates a much lower cost for a tunnel than other estimates for this type of infrastructure; it fails to consider the risk of a spill to the Great Lakes, rivers and streams from other portions of the 64-year-old pipeline if the Straits portion were rebuilt. Dynamic Risk prefers new pipelines, which was evident when the firm aggressively promoted building a tunnel in its proposal to do this report, and its analysis is deeply flawed.

 

5,363 COMMENTS
Help Reach the Next Goal: 6,000 comments

Will you submit your comment?

or Text PROTECT to +12314804112 to sign or Text PROTECT! to +12314804112 to sign

Showing 3503 reactions

  • Kimberly Kinnan
    signed 2017-11-28 14:47:43 -0500
    The Great Lakes are just that, GREAT, for so many reasons. Lets protect them as much as we possibly can and shut down the dangerous Line 5!
  • Kay Fricke
    signed 2017-11-28 14:36:39 -0500
  • Brenda Kennedy-Muraski
    signed 2017-11-28 14:34:10 -0500
    It’s time to shut down Line 5 before it leaks oil into the Great Lakes. The risk of damage an oil leak would do to the Great Lakes is not worth it.
  • Helen Donahue
    signed 2017-11-28 14:03:46 -0500
    I am appalled that public input will have no bearing at this point. How can a deal already have been made to clear the way for lines to continue to be used under our Great Lakes. Money talks while our environment and future generations are left with the problems to solve later. We need a removal operation not a bandaid.
  • Hilary Austin
    signed 2017-11-28 13:44:48 -0500
  • Patricia Weber
    signed 2017-11-28 13:41:29 -0500
    Enbridge has failed over and over it its truthfulness and its transparency. It’s time to move them out of our waters.
  • C Petrick
    signed 2017-11-28 13:37:32 -0500
    Please protect our Great Lakes from a disastrous oil spill
  • Joan Callahan
    signed 2017-11-28 13:34:34 -0500
    Pipelines don’t last forever… there is a 100% probability that it may break in installation and in the future as it wears out. The coastal area of Michigan is a treasure to be guarded at all costs. This is a shortcut to benefit an industry, not community.
  • Bruce Barber
    signed 2017-11-28 13:29:36 -0500
    We have the opportunity to preserve our Pure Michigan resources. It is a sad day when(not if) the pipeline catastrophe occurs and our Great Lakes will forever be changed.
  • Kailey Kanaziz
    signed 2017-11-28 13:07:57 -0500
    The carelessness and irresponsibility being portrayed by state officials in their failure to take action in removing Line 5 is disappointing. It is more important than ever to decommission Line 5, as the condition of the pipeline is only worsening with every passing day. The indisputable evidence showing the inevitable dangers that Line 5 poses to Michigan’s ecosystem, economy, and way of life cannot be ignored any longer. Preventative measures must be taken quickly to ensure an oil spill does not occur in the beautiful lakes that we are known for and call home.
  • Brenda Sipkema
    posted about this on Facebook 2017-11-28 13:06:53 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Alyssa Blakeslee
    signed 2017-11-28 12:30:04 -0500
  • Greg Surma
    signed 2017-11-28 12:29:07 -0500
    The down side: Michigan tourism wiped out by trusting a 63 year old pipeline. The State of Michigan is supporting a Canadian company and gets no financial compensation for the easement. A potential act of sabotage has to be accounted for. The Kalamazoo River is testimony to the “profit at any cost” attitude of the company. The them the risk is just a cost of doing business. Replacing or tunneling the pipeline would just be “kicking the can” down the road for 30 or 40 years and would be a horrible legacy for our generation to leave.
  • Jennifer Sommerfield
    signed 2017-11-28 12:23:01 -0500
    When are the leaders of Michigan going to take care of it and act responsibly? Pure Michigan oilspill is going to be our reality. Sad none of our Michigan politicians or celebrities take this seriously. Why do we need a disaster to happen until officials care?
  • Jose Perez-Sanz
    signed 2017-11-28 11:43:07 -0500
    Please enlighten me, what is so attractive to the State and the people of Michigan about this pipeline? Do we receive a treasure trove of benefits? Is there no or minimal risk to the beautiful waters and shores which are among our greatest treasures? Who is profiting from this deal? Whom is this deal serving? I simply do not understand why we even need to talk about this.
  • Marshall Clabeaux
    signed 2017-11-28 11:42:49 -0500
    We hold an increasingly important responsibility of protecting 1/5 of the WORLD’S fresh water. We cannot continue to put that resource at risk. We know pipelines fail, let alone 65 year old ones. We know we have the technology to reduce our dependence on the product in this pipeline. We know Enbridge’s track record. We know we must be PROACTIVE, it will be too late to be reactive. We would not build this pipeline today even with ‘state of the art’ pipeline technology. This is THE most sensitive spot in the world for a pipeline.


    To our Governor and AG who wants to be Governor, now is a great time to exhibit leadership and protect what makes our state so great.


    SHUT DOWN LINE 5! THE PEOPLE HAVE SPOKEN!
  • Ryan Enderle
    signed 2017-11-28 11:41:51 -0500
    We can not afford the risk of allowing continued operation of Line5. This poses far too large of a risk and should be shut down immediately.
  • Patrick Dean Smith
    posted about this on Facebook 2017-11-28 11:40:48 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Virginia Hughes
    signed 2017-11-28 11:39:45 -0500
    With all the oil spills that have happened in this country, I do not see how you can justify endangering a major water system.
  • Patrick Smith
    signed 2017-11-28 11:39:07 -0500
  • John Marin
    signed 2017-11-28 11:25:53 -0500
    Endangering this American jewel is short-sighted and reckless. Please prevent a catastrophic mess and shut down Line 5.
  • Kathleen Mcgauley
    signed 2017-11-28 11:16:47 -0500
    The safety and protection of our Great Lakes is the most important safeguard of our economy in Michigan. How could we possibly justify trusting everything to Enbridge with their recent track record. This agreement is reckless.
  • Linda Hersey
    signed 2017-11-28 11:09:38 -0500
    Misconceptions about the safety of Line 5 are numerous. It’s time to shut down line 5 before

    there’s a catastrophic oil spill in our precious Great Lakes and tributaries.
  • Tom Emmott
    signed 2017-11-28 11:04:08 -0500
    SHUT IT DOWN! It’s going to blow and you will be responsible. New evidence is being found all the time.
  • Abbey Stolle
    posted about this on Facebook 2017-11-28 10:59:06 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.
  • Abbey Stolle
    signed via 2017-11-28 10:58:26 -0500
  • Patricia Hetes
    signed 2017-11-28 10:56:45 -0500
    The Great Lakes border several states and Canada as well. No where else in the world is there a larger concentration of fresh bodies of water. We and animals all need water to live. Period. Where on earth are the Enbridge’s brains? Money$$$$!!! Wake up Canada!
  • Denell Benner
    signed 2017-11-28 10:39:12 -0500
    The alternative temporarily accepted by the State for Enbridge Line 5, only requires Enbridge to further study safety measures for the line under the Straits. Yet, Enbridge has proven by previous studies that they cannot be trusted! In the meantime the clock is ticking on this aged & damaged pipeline. At the veryleast, the line should be shut down until August, while Enbridge is studying safety measures. It takes away the risk of a spill during this period and provides Enbridge with incentive to come up with a viable plan. The only viable plan, in my opinion, is to shut down this line, and let Enbridge find an alternative means of getting their crude to Canadian refineries.
  • Jaime Redding
    signed 2017-11-28 10:36:28 -0500
    Please put the Straits of Mackinac above money for once. Shut down line 5!
  • Tad Archer
    posted about this on Facebook 2017-11-28 10:32:03 -0500
    JOIN ME and tell the State of Michigan the only acceptable way to protect the Great Lakes is to SHUTDOWN LINE 5.

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates