Take Action

Add your name to these public comments to be submitted to MDEQ on June 29, 2017, by signing the petition to the right.

Enbridge is attempting once again to upgrade its dangerous Line 5 oil pipelines in the Mackinac Straits without any public hearing that would examine the condition of these outdated pipelines.

When they tried this eight months ago, Enbridge ran into a solid wall of public opposition. Recent revelations that their pipelines have unsupported spans that exceed the maximum length allowed means there is a heightened risk of metal fatigue and failure.

Submit Your Public Comment: Sign this Petition

Like-New Pipelines?

See Newly Uncovered Video

Join us in asking the Michigan Department of Environmental Quality (MDEQ) as part of its permit conditions to conduct a comprehensive review of Enbridge's Line 5 in the Straits before the company attempts to squeeze more life out of their aging pipelines.

Please note that submitting your public comment here has nothing to do with the Line 5 ballot proposal that is being circulated.

To the Michigan Department of Environmental Quality:

We are writing in reference to Enbridge’s joint application to the Michigan Department of Environmental Quality (“MDEQ”) and United States Army Corps of Engineers (“Corps”) (No. 2RD-DFDK-Y35G) to install 22 anchor supports on the Line 5 pipelines in the Mackinac Straits.

We urge the MDEQ to reject Enbridge’s application as incomplete and to hold a public hearing as provided in Section 32514 of the Great Lakes Submerged Lands Act (“GLSLA”) and R 322.1017 (Rule 17), along with proper notice and additional time for public comment. The magnitude of public interest in Line 5 and the Great Lakes warrants a public hearing on this important matter.

Enbridge’s application is deficient for the following reasons:

  1. it fails to demonstrate the potential adverse harm from a catastrophic oil spill in the Great Lakes;
  2. it fails to demonstrate feasible and prudent alternatives to Line 5, which include a range of alternatives related to Enbridge’s ongoing expansion of oil transport throughout the Great Lakes region;
  3. it fails to demonstrate compliance with the 1953 Easement with the State of Michigan and to evaluate Enbridge’s piecemeal expansion of Line 5; and
  4. additional information about the integrity of the entire submerged Line 5 infrastructure is critical to protecting the public’s paramount interests in the Great Lakes.

Under Michigan’s GLSLA, the MDEQ cannot grant approval of this permit unless the following standards are addressed: a) a determination that the environment will be minimally harmed and that those adverse impacts will be mitigated; and (b) there is no feasible and prudent alternative to the proposed activity that will protect the public health, safety and welfare. Enbridge’s application fails on both counts.

As an immediate emergency measure or condition of Enbridge’s application, MDEQ should suspend or reduce the transport of the rate of flow of crude oil through Line 5 in the Straits to immediately reduce the pressure and risk from the twin-pipelines in the Straits pending further proceedings; in the alternative, order the installation of anchors to reduce spans without supports below 140 feet pending further proceedings with the express condition that no assurance of any final permit under the application without a demonstration of compliance with state law.

Enbridge incorrectly claims its proposed patchwork response to Line 5’s major structural defects is “routine maintenance” when in reality the requested anchor supports will further the continued expansion of Line 5 and Line 6B in southern Michigan to largely transport Canadian oil to Canadian refineries and overseas markets.

Moreover, the recent disclosure of the Kiefner Report reveal that Enbridge has for years, perhaps decades, systematically violated the provision of the 1953 Easement with the State of Michigan that limits unsupported stretches of Line 5 to 75 feet for the pipeline’s structural integrity and longevity. This neglect coupled with the Straits powerful underwater currents likely has caused metal fatigue damage. This is particularly concerning since Line 5 currently transports 540,000 barrels per day (bbls) - 80 percent over its original design capacity.

With no reliable model to predict lakebed washouts due to the highly dynamic nature of currents in the Mackinac Straits, Enbridge cannot meet its legal duty under the state easement to prudently operate this pipeline.

The law is clear. The State of Michigan and MDEQ have “a perpetual duty . . . to secure to its people the prevention of pollution, impairment or destruction of its natural resources, and rights of navigation, fishing, hunting, and use of its lands and waters for other public purposes.” Therefore, the MDEQ must undertake a formal comprehensive review of impacts and alternatives associated with Enbridge’s entire Line 5 pipeline in the Straits and waters and bottomlands of the Great Lakes.

This duty is separate and independent from the Line 5 risk and alternative studies commissioned by the Michigan Pipeline Safety Advisory Board.

In sum, no final permit should be authorized until Enbridge has demonstrated the following: (1) Line 5 in the Straits is not likely to impair the protected public trust waters and uses in the Straits and beyond; (2) there exists no feasible and prudent alternative to Enbridge for Line 5 in the Straits within Enbridge’s overall capacity throughout its “Lakehead” or Great Lakes pipeline system; (3) it has provided additional information on the pipeline metal fatigue and heightened risk of failure; and (4) it is not violating the 1953 Easement with the State of Michigan.

 

 

This recently uncovered video from 2012 showing the condition of the Line 5 pipelines reveals long unsupported spans and other damage to the pipes. No amount of anchors will fix the shifting bottomlands of the Great Lakes, or repair the metal fatigue introduced by the decades-long unsupported spans. After you've seen the video, please SIGN THE PETITION.

 

2,683 SIGNATURES
Help Reach the Next Goal: 3,000 signatures

Will you sign?


Showing 2745 reactions

  • Sally Sperry
    signed 2017-06-21 12:15:02 -0400
  • Joyce Bean
    posted about this on Facebook 2017-06-21 12:13:55 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!
  • Christy McGillivray
    signed 2017-06-21 12:13:23 -0400
    DEQ—-don’t let us down. We are relying on you to hold the line against polluters. Our Great Lakes are so much more valuable than Enbridge’s profit margin. Do the right thing!
  • Joyce Bean
    signed via 2017-06-21 12:13:12 -0400
  • George Cole
    signed 2017-06-21 12:12:24 -0400
  • William Rosemurgy
    signed 2017-06-21 12:12:05 -0400
    SHUT DOWN LINE 5. NO OIL IN THE GREAT LAKES.
  • Brenda Earl
    signed 2017-06-21 12:12:01 -0400
  • Frank Vaydik
    posted about this on Facebook 2017-06-21 12:09:42 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!
  • Frank Vaydik
    signed 2017-06-21 12:09:13 -0400
    Every tie a deficiency is pointed out Enbridge fixes it – AFTER the DISCOVERY OF THE DISCREPANCY! How can you, the DEQ trust them?
  • Barbara Murray
    posted about this on Facebook 2017-06-21 12:09:09 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!
  • Barbara Murray
    @bam5496 tweeted link to this page. 2017-06-21 12:09:07 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now! http://www.oilandwaterdontmix.org/anchor_structure_public_comment?recruiter_id=6042
  • Karen Wachs
    @haleesbluelace tweeted link to this page. 2017-06-21 12:08:50 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now! http://www.oilandwaterdontmix.org/anchor_structure_public_comment?recruiter_id=5837
  • Karen Wachs
    signed 2017-06-21 12:08:41 -0400
    It is incomprehensible that this pipeline is allowed to operate. Enbridge can no longer meet its legal duty to the State of Michigan and the Michigan Department of Environmental Quality required to operate Line 5. Enbridge lies about how much of the oil transported in this pipeline benefits Michigan residents. The reality is that only 3-5% of the transported oil is used in Michigan. It is basically a conduit to carry oil from western Canada to Eastern Canada via our precious Great Lakes. In addition to the dangerous section that runs under the Mackinac Straits, the pipeline runs under 20 rivers and creeks that feed into Lake Michigan as it crosses across land in the U.P. It is way past time to close this pipeline down.
  • Betty Bushey
    signed 2017-06-21 12:08:37 -0400
    How much is too much? In my opinion, one drop is too much. Shut it down.
  • Kirk Bails
    signed 2017-06-21 12:07:46 -0400
  • David Bridge
    posted about this on Facebook 2017-06-21 12:07:42 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!
  • Jerry Maliszewski
    posted about this on Facebook 2017-06-21 12:07:23 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!
  • Kirk McMurray
    signed 2017-06-21 12:07:19 -0400
    Shut it down!
  • Patricia Cox
    signed 2017-06-21 12:07:07 -0400
  • David Bridge
    signed 2017-06-21 12:06:47 -0400
  • Jerry Maliszewski
    signed 2017-06-21 12:06:20 -0400
    Absolutely not do I agree that we should continue to pump oil through a waterway of the largest freshwater supply on earth. One table spoon of oil ruins the drinking water supply on a Navy carrier. Please stop the greed!
  • Susan Lenfestey
    posted about this on Facebook 2017-06-21 12:05:59 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!
  • Daniel Jahn
    signed 2017-06-21 12:05:50 -0400
  • Walt Enterline
    posted about this on Facebook 2017-06-21 12:05:46 -0400
    Here's a petition to discontinue operating the 60-year old Enbridge Line 5 oil pipeline under the Straits of Mackinac.
  • Susan Lenfestey
    signed 2017-06-21 12:05:45 -0400
  • Jenifer Malyn
    posted about this on Facebook 2017-06-21 12:05:02 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!
  • Jenifer Malyn
    @jaymiller143 tweeted link to this page. 2017-06-21 12:04:59 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now! http://www.oilandwaterdontmix.org/anchor_structure_public_comment?recruiter_id=35236
  • Barbara Murray
    signed 2017-06-21 12:04:42 -0400
  • Thomas Erickson
    signed 2017-06-21 12:04:23 -0400
  • James Nelson
    posted about this on Facebook 2017-06-21 12:03:30 -0400
    SIGN THE PETITION: Enbridge cannot be allowed to squeeze more life out of this dangerous pipeline. Speak up now!

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates