Take Action

Add your name to these public comments to be submitted to MDEQ by signing this petition.

OWDMTake Action Now

Michigan’s year-long study of Line 5 alternatives has been released. Now is the time to submit your comment calling for the only way to truly protect the Great Lakes from an oil spill: decommission the Enbridge Line 5 pipelines through the Straits of Mackinac.

Protect the Great Lakes from a Catastrophic Oil Spill

Deadline for comments is August 4, so please submit yours today via this online form in support of protecting the Great Lakes from a catastrophic oil spill.

To the Michigan Department of Environmental Quality, Michigan Agency for Energy, Michigan Department of Natural Resources, and Office of the Attorney General:

I am writing to submit my official comment in response to the State of Michigan’s Line 5 alternatives analysis. This report was expressly commissioned for the overall purpose of “providing the State, Enbridge and the public with information that can be used to help guide decisions for the future of [Line 5 in the Straits].”

I am deeply disappointed in this analysis and this process riddled with conflict of interest. It lacks credibility because Dynamic Risk, a firm with ties to Enbridge, is its author. Even worse, it absurdly underestimates the impact of a spill and ignores a viable alternative to Line 5 – use of existing infrastructure. An expert review in December 2015 by advisors to a Great Lakes policy organization documented the practicality of this alternative.

Decommissioning Line 5 in the Straits of Mackinac is the only alternative that will prevent an oil spill with catastrophic consequences for the Great Lakes and the State of Michigan. It is time for the state to stop delaying action with flawed studies, exercise its legal duty as public trustee, and shut down Line 5. The state should use that authority through enforcement of its easement, an agreement that Enbridge has consistently violated. 

Specifically, the draft report on alternatives to Line 5 in the Mackinac Straits:

  1. Fails to follow the recommendations and standards outlined in the Michigan Petroleum Pipeline Task Force Report and should be withdrawn.
  2. Neglects to provide the state with an independent, fair analysis of the alternatives to Line 5. This report is clearly biased toward allowing Line 5 to continue to operate and/or allowing Enbridge to build new oil infrastructure and further expand its operations. That bias grows out of past, and potentially future, business relationships between Enbridge and the report’s authors. Clearly, the authors are not “wholly independent from any influence by Enbridge,” a standard for establishing credibility in the report’s findings that is outlined in the Task Force Report.
  3. Ignores using existing pipeline infrastructure as an alternative to Line 5 in the Straits, which was one of the alternatives the state required Dynamic Risk to analyze, and leaving it out is in conflict with Task Force recommendation 3 (b). It is unacceptable that the contractor eliminated this alternative in the early stages of analysis, and this must be remedied in the final report.
  4. Does not provide a worst-case scenario spill and cost analysis, which was one of the main objectives of this report and was specifically required by the state in its request for proposals under Section II-B. Instead, Dynamic Risk uses assumptions of risk that are woefully inadequate and are not credible. It estimates that:
    • Only 20-miles of shoreline would be impacted by a spill. This is 3% of the 720-mile area the University of Michigan found vulnerable to a spill in its 2016 study.
    • An oil spill would cost $100 to $200 million when Enbridge’s cleanup costs of its Kalamazoo River Line 6B pipeline oil spill in 2010 cost more than $1.2 billion.
  5. Overestimates an impact to propane supply, greatly exceeding what independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary, while another study found it would take only one railcar or 3 - 4 truckloads per day to replace Line 5 propane supply to the U.P.
  6. Shows unfair bias towards building a tunneled pipeline. The report estimates the cost of a tunnel much lower than other estimates for this type of infrastructure; it fails to consider the risk of a spill to the Great Lakes, rivers and streams from other portions of the 64-year-old pipeline if the Straits portion were rebuilt; and it fails to look at the other health and environmental consequences of allowing Enbridge to build a tunnel and further expand its transport of mostly Canadian oil through Michigan for export. Dynamic Risk has a preference for new pipelines, which was evident when the firm aggressively promoted building a tunnel in its proposal to do this report, and its analysis is deeply flawed.

The magnitude of the risk of a spill is too severe to allow Line 5 to continue to operate in the Great Lakes. Michigan should not put the Great Lakes, our economy, health, drinking water, fisheries, and way of life at risk from a catastrophic oil spill any longer.

I urge you to act as legal public trustees of our waters and bottomlands, enforce the ongoing easement violations, and begin the process of decommissioning Line 5 in the Straits of Mackinac to protect the Great Lakes from a catastrophic oil spill. The State of Michigan has an independent legal duty to take this enforcement action based on Enbridge’s ongoing violations.

Please note that submitting your public comment here has nothing to do with the Line 5 ballot proposal that is being circulated.

 

9,830 COMMENTS
Help Reach the Next Goal: 11,000 comments

Will you submit your comment?

or Text SHUTDOWN to +12314804112 to sign or Text FINAL to +12314804112 to sign

Showing 7651 reactions

  • Matt Ellison
    signed 2017-08-03 16:02:48 -0400
  • Madeline Kirkwood
    signed 2017-08-03 16:00:56 -0400
  • Barbara Murphy
    signed 2017-08-03 15:59:31 -0400
  • Alissa Addy
    signed via 2017-08-03 15:55:23 -0400
    Shut down line 5. Water is life.
  • Andrea Hallock
    signed 2017-08-03 15:53:30 -0400
    Please protect our water.
  • Kathryn Becker
    posted about this on Facebook 2017-08-03 15:52:09 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • David Bobier
    signed 2017-08-03 15:50:13 -0400
    Please protect the GREAT Lakes!!!
  • Claudius Vincenz
    signed 2017-08-03 15:49:13 -0400
  • Denise Sica
    posted about this on Facebook 2017-08-03 15:48:28 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Denise Sica
    signed 2017-08-03 15:47:56 -0400
    There is no good reason to continue to spend time and money researching the dangers vs safety of Line 5, and the alternatives routes to Line 5 – or – we can do the safest and most responsible thing by setting a date (soon) for shut down. We have allowed this Line to exist long enough and have been lucky that no disaster has occurred. Once it leaks we cannot reverse the damage. Enbridge is smart enough to figure out its own alternatives, in its home country of Canada which is where the majority of this oil goes. VOTE TO SHUT DOWN this pipeline now. You will be serving the people of Michigan and this country responsibly in doing so, as well as protecting the water for all.
  • Bruce Evans
    signed 2017-08-03 15:46:59 -0400
    bruce evans
  • Beverly Strassmann
    signed 2017-08-03 15:45:49 -0400
    Beverly Strassmann: We citizens will hold our elected officials responsible through the media and the courts.
  • Noel Chapp
    signed via 2017-08-03 15:44:31 -0400
    We are water, it is life-protect us.
  • Andrea Agrimonti
    signed via 2017-08-03 15:44:13 -0400
  • Pam Hughes
    signed 2017-08-03 15:43:12 -0400
    Decommission Line 5 through the Straits of Mackinac – Protect the Great Lakes from an oil spill!
  • Lissette Rosado
    signed 2017-08-03 15:41:11 -0400
    We must shut down line 5!! We need to protect the health and safety of our lakes, communities, and the entire world who depends on the Great Lakes.
  • Daniel Steinmetz
    signed 2017-08-03 15:37:12 -0400
    We have had enough oil spills in MI. Please protect us and our great natural resources
  • Donna Cunning
    signed via 2017-08-03 15:34:56 -0400
  • Katherine Carrigan
    posted about this on Facebook 2017-08-03 15:33:07 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Heather Miller
    signed via 2017-08-03 15:33:03 -0400
  • Katherine Carrigan
    signed via 2017-08-03 15:32:50 -0400
    Not only is this pipeline dangerous to the lakes because of environmental concerns and age but it could be a terrorist target that would affect more people and land that targeting one city.
  • Ian Valaik
    signed 2017-08-03 15:30:36 -0400
  • Ronald Bush
    signed via 2017-08-03 15:25:56 -0400
  • Michael Cazabon
    signed via 2017-08-03 15:21:12 -0400
  • Chris Pospisil
    posted about this on Facebook 2017-08-03 15:19:14 -0400
    SIGN THE PETITION to tell the State of Mich. the only acceptable way to protect the Great Lakes is Shut Down Line 5.
  • Chris Pospisil
    signed via 2017-08-03 15:18:57 -0400
    Endbridge,s record is appalling. It’s just a matter of time, when this spill will happen. Lets do the right thing, in this world of so many wrongs. The right thing before it happens and destroys so much.
  • Michael Aquilina
    signed via 2017-08-03 15:15:17 -0400
  • Pat Labreck
    signed via 2017-08-03 15:13:25 -0400
  • Nick Landgrebe
    signed 2017-08-03 15:13:09 -0400
  • Deb VandenBroek
    signed 2017-08-03 15:13:09 -0400

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates