TAKE ACTION

Sign this petition calling on the protection of the Great Lakes, the climate, and of all Michiganders.

Tell the Michigan Department of Environment, Great Lakes & Energy (EGLE) to deny Enbridge permits to construct a fossil fuel tunnel through the Great Lakes. Science demands that we shift to using clean energy now. Serious flaws in the permits put us all at risk.

SIGN THE PETITION

We'll send your signature to EGLE before the October 19 deadline for public comment on the Enbridge tunnel permit.

UPDATE - Monday, Oct 19, 11:00 PM: Signatures here will no longer be delivered to EGLE. You can still submit a comment by visiting this comment page and submitting an email by 11:59 PM tonight.

To the Michigan Department of Environment, Great Lakes & Energy (EGLE):

I urge you to reject Enbridge Energy’s application for permission to relocate its pipelines into an oil tunnel through the bottomlands of the Great Lakes. This is not simply a relocation - it is new fossil fuel infrastructure.

Building an oil tunnel through the Straits of Mackinac would continue to endanger public trust waters and bottomlands at the Straits, and would continue the risk to our waters posed by Line 5's other 400-plus water crossings. Feasible and prudent alternatives to the energy currently provided by Line 5 exist - this project is not in the public's interest.

The science is clear that to avoid significantly worsening impacts of climate change, we must rapidly reduce greenhouse gas emissions, including from the burning of fossil fuels. Allowing Enbridge to build a new pipeline that can transport oil for up to 99 years through our state will exacerbate climate change, the impacts of which are already harming our state and its residents.

Building an oil tunnel would take five or more years at a time when the existing pipeline may keep operating, extending the risk of a devastating oil spill into the Great Lakes and exposing Michiganders to a heightened risk of contaminated drinking water, endangered livelihoods, and lost access to recreational activities.  

I ask that you protect our Great Lakes, our state, and our families from the worsening impacts of climate change by rejecting this application.

2,442 SIGNATURES
Help Reach the Next Goal: 2,500 signatures

Will you sign?


Showing 2106 reactions

  • Bob Meyer
    signed 2020-10-13 09:35:39 -0400
  • Dan Reelitz
    signed 2020-10-13 08:33:56 -0400
    The Enbridge plan is an extreme risk to our pristine Great Lakes. The tunnel is a new project and violates the bottoms land act. 600 miles of 67 year old pipeline would remain in service with no plan for replacement. Shut down this pipeline now!
  • Kenneth Phillips  II
    signed 2020-10-13 08:24:33 -0400
    The State of Michigan doesn’t need to facilitate the use of more fossil fuels. There is no such thing as a leak free pipeline, let’s stop this destructive process.
  • Robin Barney-Lees
    signed 2020-10-13 07:14:33 -0400
  • Albert Henning
    signed 2020-10-13 07:05:10 -0400
  • Suzanne Schoenfelt
    signed via 2020-10-13 05:13:47 -0400
  • Margaret Mann-DeVos
    signed 2020-10-13 00:08:17 -0400
  • Karen Baka
    signed 2020-10-12 23:53:28 -0400
  • Audrey Flanders-Sundstrom
    signed 2020-10-12 23:31:35 -0400
  • Lydia O’Connor
    signed 2020-10-12 23:19:28 -0400
  • Patricia Ahlgren
    signed via 2020-10-12 23:06:43 -0400
  • Jeanne Fahlstrom
    signed 2020-10-12 23:06:02 -0400
  • Madeline Baroli
    signed 2020-10-12 22:40:41 -0400
    Shut it down already! No work arounds from Enbridge – fossil fuels are not the future.
  • Sharon Popp
    signed 2020-10-12 22:36:17 -0400
  • Judith Reich
    signed 2020-10-12 22:32:11 -0400
  • Linda Luke
    signed 2020-10-12 22:20:58 -0400
  • Carol Johnston
    signed 2020-10-12 22:17:27 -0400
  • Robin McCullough
    signed 2020-10-12 21:36:30 -0400
  • Jill Henemyer
    signed 2020-10-12 21:24:34 -0400
  • Jo Nowakowski
    signed 2020-10-12 21:13:58 -0400
  • Diane Crawford
    signed 2020-10-12 20:57:11 -0400
  • DeNell Benner
    signed 2020-10-12 20:47:54 -0400
    No tunnel, no pipeline. It is way past time for Enbridge to find another route for their dirty tar sands oil. It is not in the interests of Michigan, to remain a shortcut for a Canadian oil company with a sorry safety record. Line 5 is a disaster waiting to happen. It has been operating on borrowed time for decades. It needs to be decommissioned.
  • Patricia Buchner
    signed 2020-10-12 20:47:06 -0400
  • Brian Chace
    @ChaceBrian tweeted link to this page. 2020-10-12 20:19:27 -0400
    Do you love an oil-free Great Lakes? They're under threat, you know. Join me and sign this petition calling on @MichiganEGLE and @EGLEDirector to reject the Enbridge Line 5 Oil Tunnel. #NoTunnel #SDL5 https://www.oilandwaterdontmix.org/egle_no_tunnel_petition?recruiter_id=82340
  • wendy case
    signed 2020-10-12 20:19:06 -0400
  • Brian Chace
    signed via 2020-10-12 20:19:00 -0400
  • Ronald Ferguson
    signed 2020-10-12 20:01:45 -0400
  • Leslie Martin
    signed 2020-10-12 19:50:53 -0400
  • Lu Thrushman
    signed 2020-10-12 19:48:47 -0400
  • Gary Mortensen
    signed 2020-10-12 19:31:44 -0400

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates