TAKE ACTION

Tell the DEQ they need to follow the law. Sign this petition now.

OWDMTake Action Now

The entire engineering of how the Line 5 pipeline is anchored to the Great Lakes bottomlands has changed - WITH NO STATE REVIEW or approval.

Enbridge is asking the Michigan Department of Environmental Quality (DEQ) to approve the company’s application to add 22 new screw anchors to prop up Line 5. Enbridge is trying to get around a full legally-required review of the rest of the underwater portion of the pipeline and is ignoring the effect that these anchor supports will have on the integrity of the pipeline moving forward.

The original pipeline design did not specify the use of screw anchors. In fact, this type of anchor is responsible for a majority of the coating damage that Enbridge has known about since at least 2014, but the public just found out about in October 2017.

Anchors are not a repair - they're new infrastructure

According to state law, new materials used to support the pipeline should trigger a full integrity review of the entire underwater segment of Line 5. The DEQ has failed to follow the law, and in doing so, they have failed to hold Enbridge responsible - even with the Great Lakes ecosystem and 720 miles of shoreline at risk.

Sign the Petition

Director Grether, Division and Unit Chief Fish, and the Gaylord Office Unit Supervisor Haas, and Great Lakes Submerged Land Specialist Graft:

We urge you to deny Enbridge’s pending Line 5 anchor permit application to install 22 new screw anchors onto the bottomlands of Lake Michigan, and instead, require Enbridge to file a new conveyance application for the entire underwater Line 5 pipelines to occupy our public trust waters and bottomlands of the Great Lakes. This is what the law requires.

Enbridge’s Screw Anchors Constitute a New Design, Not a Repair. Since 2002, Enbridge has installed 128 permanent screw anchors along Line 5 fastened into the lakebed, contending that this new design is mere repair and maintenance. This new engineering design, however, has transformed the entire underwater pipeline infrastructure by elevating it off the lakebed floor.

The original 1953 engineering design placed Line 5 pipelines in a trench on the bottomlands with no maximum support longer than 75 feet to prevent metal fatigue and rupture. This engineering design was a key provision of the 1953 legal Easement between Enbridge and the State of Michigan. But Enbridge routinely violated the 75-foot maximum span requirement and did not properly design its dual pipelines to withstand the swift currents in the Straits of Mackinac.

For nearly the first 50 years of Line 5 occupying the public trust waters of Lake Michigan, Enbridge used sandbags to provide support. Enbridge’s “solution” – to elevate the pipeline off the lakebed floor with screw anchors – is not a mere repair, but rather a completely new design that was never authorized and has never been evaluated under the 1955 public trust law of the Great Lakes Submerged Lands Act (“GLSLA”).

New Evidence Reveals that Enbridge Knew Screw Anchors Were Damaging Line 5 Pipeline Coating Since 2014. In October 2017 – four months after Enbridge submitted the original DEQ permit — the public learned that Enbridge had acted in bad faith and had known about damage to Line 5’s protective coating in the Straits of Mackinac as early as 2014 but did not disclose this critical information to state or federal officials until late in the summer of 2017. This material information could have altered previous state and federal authorizations in 2016 and 2017 that allowed additional screw anchors to be installed into the lakebed.

Material Change Triggers Full Review of Entire Underwater Pipeline Infrastructure. Given Line 5’s new design with permanent structures and material changes, the DEQ must direct Enbridge to go back to the drawing board and submit a new conveyance application under the law. Nothing less than this will protect the Great Lakes from a catastrophic oil spill.

2,235 SIGNATURES
Help Reach the Next Goal: 2,500 signatures

Will you sign?


Showing 2186 reactions

  • David Flickema
    signed 2018-02-18 07:32:05 -0500
  • Charles Billups
    signed 2018-02-18 07:31:37 -0500
  • Sharon Burkart
    signed 2018-02-18 07:31:28 -0500
  • William Henne
    signed 2018-02-18 07:31:26 -0500
  • Fred Lenz
    signed 2018-02-18 07:30:50 -0500
  • Melissa Porter
    signed 2018-02-18 07:30:28 -0500
  • Pam Ward
    signed 2018-02-18 07:30:13 -0500
  • Kelly LaCosse
    signed 2018-02-18 07:30:05 -0500
  • John Kirby
    signed 2018-02-18 07:30:05 -0500
  • Nancy & Kent Walton
    signed 2018-02-18 07:29:48 -0500
  • Gerry Brindel
    signed 2018-02-18 07:29:33 -0500
  • Jandy Sprouse
    signed 2018-02-18 07:29:17 -0500
  • Margaret Woodward
    posted about this on Facebook 2018-02-18 07:28:38 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Kathy Morrison
    posted about this on Facebook 2018-02-18 07:28:25 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Patti Laubaugh
    signed 2018-02-18 07:28:11 -0500
    What will it take for the state of Michigan to ensure its waterways are being fully protected??? Please stop Enbridge from trying to circumvent the law at every turn…they’re pulling out all stops to keep Line 5 up and running while the state (it seems) flim flams back and forth trying to keep the citizens at bay and Enbridge up and running at any price . Protect the waterways, please. It’s your responsibility to be good stewards of the natural resources. If you can’t so so please step down and let someone who has the courage to do so.
  • Kathy Morrison
    signed 2018-02-18 07:28:09 -0500
  • Mary Armstrong
    signed 2018-02-18 07:27:58 -0500
  • Dennis Aylward
    signed 2018-02-18 07:27:57 -0500
  • Dennis Aylward
    signed 2018-02-18 07:27:57 -0500
  • Mary Kay Horn
    signed 2018-02-18 07:27:48 -0500
  • Linda Rogers
    signed 2018-02-18 07:27:42 -0500
    It’s like waiting for another mass shooting. The leadership of Michigan HAS THE AUTHORITY to shut this pipe down but they just keep waiting for a catastrophe.
  • Heidi Fricks
    signed 2018-02-18 07:27:29 -0500
  • Mary Skrocki
    signed 2018-02-18 07:27:13 -0500
  • Sherri Brom
    signed 2018-02-18 07:26:40 -0500
  • Juleen Jenkins-Whall
    signed 2018-02-18 07:26:36 -0500
    I have read and agree with these statements.
  • Jon Kinne
    signed 2018-02-18 07:25:58 -0500
  • David Picard
    posted about this on Facebook 2018-02-18 07:25:36 -0500
    Join me and SIGN THIS PETITION. The DEQ must demand a review of the Line 5 pipeline before approving more anchors.
  • Maxxcell Higdon
    signed 2018-02-18 07:25:29 -0500
  • David Picard
    signed 2018-02-18 07:25:06 -0500
  • George Sinnott
    signed 2018-02-18 07:24:22 -0500

You can help now.


Join those working to protect the Great Lakes & climate from the Enbridge Line 5 crude oil pipeline.

Get updates